Proposition 1B - Public Transportation Modernization, Improvement, and Service Enhancement
Title | County | Total Project Cost (x1000) |
Total Bond Funding* (x1000) |
Planned Construction Start |
Planned Construction Finish |
ACE Maintenance and Layover Facility
|
Alameda | $79,235 | $787 | 08/01/2011 | 12/31/2014 |
ACE Santa Clara/Caltrains Station Improvements
|
Alameda | $5,205 | $320 | 12/01/2009 | 09/30/2011 |
ACE Station Improvements
|
Alameda | $3,404 | $204 | 09/01/2011 | 12/31/2012 |
BART - Oakland Airport Connector
|
Alameda | $498,467 | $18,201 | 06/01/2011 | 05/31/2014 |
BART Ashby Elevator
|
Alameda | $4,412 | $1,729 | 03/16/2009 | 11/23/2011 |
BART Stations Modernization
|
Alameda | $197,012 | $191,243 | 06/01/2010 | 08/31/2021 |
BART Warm Springs Extension
|
Alameda | $822,864 | $37,172 | 05/01/2009 | 07/31/2018 |
Berkeley BART Plaza/Transit Area Improvements
|
Alameda | $14,757 | $3,726 | 12/01/2015 | 12/28/2018 |
Bus Hoists & Washers
|
Alameda | $32,201 | $13,063 | 08/01/2014 | 07/31/2018 |
Bus Stop Repair/Refurbishment
|
Alameda | $323 | $241 | 10/01/2014 | 05/31/2018 |
CAD/AVL/Radio Replacement
|
Alameda | $29,774 | $6,349 | 01/01/2014 | 12/31/2021 |
Contra Costa College Transit Center Improvements
|
Alameda | $325 | $160 | 03/03/2020 | 06/30/2020 |
Diesel-Electric Hybrid Articulated Buses for Rapid Service
|
Alameda | $266,351 | $9,028 | 01/05/2015 | 06/30/2021 |
Engine Rehabilitation
|
Alameda | $394 | $394 | 07/01/2011 | 10/31/2011 |
Engine Rehabilitation and Replacement Buses
|
Alameda | $1,865 | $1,742 | 05/01/2012 | 05/01/2013 |
Environmental Justice Access to BART
|
Alameda | $13,033 | $225 | 08/01/2018 | 08/01/2021 |
LAVTA Bus Stop Improvements
|
Alameda | $123 | $100 | 06/01/2008 | 07/01/2009 |
LAVTA Route 10 Bus Rapid Transit
|
Alameda | $7,751 | $1,090 | 11/01/2009 | 08/01/2010 |
LAVTA Upgrade & Improvements Project
|
Alameda | $378 | $362 | 06/30/2016 | 05/31/2022 |
LAVTA/Bus Replacement Project
|
Alameda | $3,062 | $573 | 11/01/2014 | 06/30/2016 |
LAVTA/Transit Center Upgrades & Improvements
|
Alameda | $162 | $126 | 07/01/2018 | 10/31/2019 |
MacArthur Transit Village Plaza Improvements
|
Alameda | $8,756 | $333 | 02/01/2012 | 04/30/2019 |
Replacement Buses (6)
|
Alameda | $2,736 | $129 | 06/01/2009 | 05/01/2010 |
Replacement Transit Buses
|
Alameda | $2,157 | $305 | 09/01/2014 | 03/31/2016 |
Replacement of 6 CNG Buses
|
Alameda | $2,917 | $568 | 11/30/2011 | 12/20/2012 |
Replacement of Fareboxes
|
Alameda | $12,046 | $2,324 | 09/07/2013 | 02/15/2017 |
San Leandro BART Station Terminus
|
Alameda | $7,138 | $603 | 07/31/2019 | 05/31/2020 |
San Pablo & Telegraph Rapid Bus Upgrade
|
Alameda | $12,881 | $500 | 12/01/2019 | 12/01/2023 |
Transit Access Improvement - Meekland
|
Alameda | $6,674 | $2,500 | 06/01/2017 | 12/31/2018 |
Transit Connectivity
|
Alameda | $12,935 | $9,578 | 03/25/2009 | 04/30/2018 |
Union City Replacement Buses
|
Alameda | $868 | $355 | 01/01/2008 | 12/01/2008 |
New Passenger Bus Stop Shelter
|
Alpine | $12 | $12 | 02/01/2018 | 03/23/2018 |
New Transit Vehicle for Alpine County's Dial-A-Ride
|
Alpine | $91 | $45 | 02/26/2013 | 10/10/2014 |
Security Cameras for Alpine County Transit Minivan
|
Alpine | $4 | $3 | 06/21/2018 | 08/30/2018 |
3 Replacement Buses
|
Amador | $273 | $35 | 01/01/2012 | 02/01/2012 |
Bus Rehabilitation
|
Amador | $31 | $31 | 06/01/2013 | 06/01/2014 |
Bus Stop Signage (Up to 50 bus stops)
|
Amador | $1 | $1 | 01/01/2012 | 09/20/2012 |
Bus Stops & Bus Shelters
|
Amador | $37 | $37 | 06/01/2012 | 12/31/2013 |
MOA Facility Upgrade
|
Amador | $224 | $219 | 12/01/2012 | 12/01/2016 |
Nitrogen Air Compressor
|
Amador | $20 | $20 | 10/01/2013 | 10/15/2013 |
One Bus Destination Sign
|
Amador | $10 | $10 | 01/01/2012 | 02/01/2012 |
Purchase 3 Replacement Buses
|
Amador | $298 | $298 | 01/01/2015 | 03/01/2015 |
Replacement Buses
|
Amador | $535 | $535 | 01/15/2017 | 05/31/2017 |
Shop Truck Purchase
|
Amador | $100 | $100 | 06/01/2013 | 06/30/2013 |
Sutter Hill Transit Center
|
Amador | $1,527 | $331 | 04/30/2011 | 06/30/2012 |
Sutter Hill Transit Center (Phase II)
|
Amador | $1,793 | $202 | 04/30/2011 | 06/30/2012 |
Transit Operating Base Improvements
|
Amador | $147 | $147 | 07/01/2012 | 07/31/2015 |
WI-FI Ridership Program
|
Amador | $15 | $15 | 01/01/2014 | 06/30/2014 |
Design and Construction of Transit Facility
|
Butte | $35,719 | $8,723 | 09/01/2014 | 01/01/2019 |
Purchase Rolling Stock
|
Butte | $3,416 | $1,819 | 02/21/2007 | 12/31/2008 |
Purchase of ITS Equipment - Chico
|
Butte | $345 | $337 | 02/01/2010 | 12/01/2014 |
Bus Purchases
|
Calaveras | $531 | $375 | 01/30/2019 | 01/30/2022 |
Bus Rehabilitation/Engine Overhaul
|
Calaveras | $13 | $13 | 09/01/2012 | 11/01/2012 |
Bus Shelters
|
Calaveras | $291 | $125 | 12/01/2008 | 11/01/2010 |
Bus Stop Improvements
|
Calaveras | $196 | $163 | 02/25/2018 | 06/01/2023 |
Bus Stop Rehabilitation
|
Calaveras | $18 | $18 | 07/01/2013 | 08/31/2013 |
Procurement of Five New Buses
|
Calaveras | $722 | $242 | 02/01/2008 | 03/30/2008 |
Purchase 3 Pre-fabricated bus shelters and benches
|
Calaveras | $23 | $23 | 08/01/2011 | 09/01/2011 |
Purchase AVL System
|
Calaveras | $72 | $69 | 07/01/2018 | 11/01/2018 |
Purchase Bus (Local Match)
|
Calaveras | $94 | $27 | 02/18/2015 | 09/30/2015 |
Purchase Buses (2)
|
Calaveras | $186 | $186 | 07/08/2015 | 11/23/2015 |
Purchase Buses (3)
|
Calaveras | $301 | $298 | 01/06/2016 | 07/12/2016 |
Purchase Equipment
|
Calaveras | $22 | $22 | 12/01/2015 | 04/08/2016 |
Purchase Radios
|
Calaveras | $32 | $32 | 12/03/2015 | 03/08/2016 |
Purchase Service Vehicle
|
Calaveras | $38 | $37 | 12/03/2015 | 03/04/2016 |
Purchase Vans
|
Calaveras | $99 | $99 | 06/16/2015 | 03/23/2016 |
Purchase of 2 Engines
|
Calaveras | $14 | $14 | 09/01/2012 | 09/01/2012 |
Replace (2) Existing Vehicles
|
Calaveras | $300 | $300 | 06/24/2014 | 10/03/2014 |
Schedule Holders
|
Calaveras | $5 | $5 | 07/01/2013 | 08/31/2013 |
Transit Bus Stop Facilites
|
Calaveras | $275 | $89 | 07/01/2014 | 03/01/2015 |
Vehicle Destination Signs
|
Calaveras | $15 | $15 | 01/01/2011 | 02/01/2011 |
Vehicle Maintenance Lift
|
Calaveras | $42 | $42 | 07/01/2013 | 08/31/2013 |
Bus Purchase
|
Colusa | $190 | $134 | 05/29/2023 | 06/15/2023 |
Colusa Transit Bus Covered Parking with Solar Panel Roofing
|
Colusa | $566 | $566 | 09/01/2018 | 05/01/2023 |
Colusa Transit Bus Replacement
|
Colusa | $375 | $375 | 11/01/2014 | 07/01/2015 |
Colusa Transit HQ Parking Lot Rehabilitation
|
Colusa | $39 | $39 | 11/01/2014 | 07/01/2015 |
(2) Fixed Route Vehicles for Petaluma
|
Contra Costa | $831 | $132 | 08/16/2010 | 08/16/2010 |
30 Bus Replacement
|
Contra Costa | $12,197 | $2,922 | 09/28/2011 | 02/27/2012 |
A & E for Park and Ride Lot in NW Antioch
|
Contra Costa | $359 | $327 | 07/01/2012 | 06/30/2014 |
AC Transit 2016 Transit Vehicle Replacement
|
Contra Costa | $19,590 | $3,294 | 03/01/2016 | 06/30/2017 |
AC Transit Bus Replacement
|
Contra Costa | $12,601 | $12,601 | 01/01/2008 | 06/30/2011 |
BART Pittsburgh / Bay Point Station Improvements
|
Contra Costa | $403 | $320 | 07/30/2012 | 12/16/2012 |
Bus Expansion
|
Contra Costa | $7,837 | $2,247 | 01/01/2016 | 06/30/2016 |
Bus Procurement
|
Contra Costa | $96,102 | $38,521 | 07/01/2012 | 07/01/2017 |
Bus Purchase
|
Contra Costa | $805 | $779 | 02/09/2014 | 08/25/2020 |
Bus Purchase
|
Contra Costa | $4,963 | $1,341 | 07/01/2011 | 07/01/2012 |
CCCTA - Bus Stop Access and Amenity Improvements Martinez
|
Contra Costa | $95 | $67 | 06/01/2013 | 12/01/2013 |
CCCTA Rolling Stock
|
Contra Costa | $34,806 | $5,922 | 06/30/2014 | 06/01/2017 |
CCCTA Rolling Stock Replacement
|
Contra Costa | $18,227 | $2,277 | 03/01/2009 | 05/01/2009 |
City of Concord-Bus Stop Access Improvements
|
Contra Costa | $804 | $255 | 07/01/2015 | 06/30/2023 |
Concord Intermodal Improvements
|
Contra Costa | $5,519 | $400 | 02/13/2017 | 01/24/2019 |
Contra Costa College Connection
|
Contra Costa | $376 | $70 | 01/06/2006 | 03/09/2008 |
Diablo Valley College Transit Center
|
Contra Costa | $2,697 | $558 | 06/30/2010 | 09/30/2010 |
Dial-A-Ride Vehicle Replacements
|
Contra Costa | $896 | $228 | 05/01/2015 | 05/31/2016 |
ECCTA - Bus Purchase
|
Contra Costa | $2,106 | $883 | 10/29/2010 | 04/01/2011 |
ECCTA - Bus Shelters & Amenities for Communities
|
Contra Costa | $251 | $200 | 04/30/2010 | 02/01/2015 |
ECCTA Tri-Delta Bus Purchase
|
Contra Costa | $3,178 | $607 | 01/01/2008 | 01/31/2009 |
ECCTA/Rolling Stock Replacements
|
Contra Costa | $14,168 | $1,277 | 12/04/2012 | 02/26/2018 |
Facility Rehab
|
Contra Costa | $2,906 | $1,767 | 06/01/2016 | 12/31/2022 |
Hillcrest Park & Ride Improvements
|
Contra Costa | $8,823 | $595 | 09/01/2012 | 06/30/2015 |
Intermodal Access Improvements at West County BART Stations
|
Contra Costa | $4,331 | $745 | 03/01/2015 | 10/01/2018 |
Local Match for Lynx Vehicles
|
Contra Costa | $1,185 | $106 | 08/01/2011 | 09/21/2011 |
Pacheco Transit Hub
|
Contra Costa | $2,598 | $530 | 09/01/2013 | 09/01/2014 |
Petaluma Transit (2) Paratransit Vans
|
Contra Costa | $210 | $45 | 05/01/2011 | 06/30/2013 |
Petaluma Transit-Replace 4 Fixed Buses
|
Contra Costa | $2,278 | $171 | 02/28/2015 | 08/31/2016 |
Phase 1 of the Transbay Transit Center
|
Contra Costa | $29,770 | $21,165 | 07/01/2007 | 12/31/2016 |
Real Time Signage Installation
|
Contra Costa | $67 | $67 | 05/01/2010 | 04/01/2016 |
Replacement & Expansion Vehicles
|
Contra Costa | $387 | $179 | 01/17/2016 | 05/17/2016 |
Richmond Eastside Intermodal Improvements
|
Contra Costa | $1,500 | $1,500 | 10/05/2015 | 12/18/2017 |
Rolling Stock Replacement - (42) Paratransit Vans
|
Contra Costa | $3,615 | $279 | 01/01/2011 | 01/01/2012 |
Transit Access Improvement - Hacienda
|
Contra Costa | $412 | $160 | 10/17/2014 | 10/14/2015 |
Vehicle Replacement
|
Contra Costa | $1,919 | $1,624 | 06/21/2022 | 06/30/2023 |
WestCAT LYNX Vehicle Expansion
|
Contra Costa | $587 | $565 | 02/01/2008 | 12/15/2008 |
WestCAT Lynx vehicle purchase
|
Contra Costa | $318 | $318 | 01/04/2008 | 12/15/2008 |
M & O Facility Security Upgrade
|
Del Norte | $167 | $159 | 10/01/2010 | 05/30/2023 |
Purchase Replacement Buses
|
Del Norte | $240 | $235 | 09/01/2008 | 09/08/2009 |
Replacement Buses for Redwood Coast Transit
|
Del Norte | $2,663 | $1,057 | 10/01/2010 | 06/30/2023 |
Automatic Vehicle Location (AVL) Systems
|
El Dorado | $264 | $258 | 02/02/2012 | 06/30/2012 |
BlueGO Transit System Equipment, Hardware, Software
|
El Dorado | $104 | $39 | 06/30/2012 | 03/26/2014 |
BlueGO Cutaway & Trolley Vehicle Purchase
|
El Dorado | $85 | $59 | 03/01/2010 | 06/30/2012 |
BlueGO Transit System Modernization Improvement
|
El Dorado | $324 | $282 | 12/20/2018 | 02/29/2020 |
Bus Garage & South Y Transit Station Improvements
|
El Dorado | $27 | $26 | 11/26/2008 | 06/30/2009 |
Bus Lift Replacement
|
El Dorado | $203 | $203 | 10/01/2014 | 12/01/2014 |
Bus Shelters-Tahoe Basin/El Dorado Co.
|
El Dorado | $395 | $152 | 10/01/2011 | 06/30/2014 |
Bus Surveillance Equipment Upgrade
|
El Dorado | $294 | $168 | 04/30/2014 | 09/30/2014 |
Commuter Bus Replacement/57 Passenger-El Dorado Co.
|
El Dorado | $518 | $299 | 10/02/2008 | 06/30/2010 |
Commuter bus replacement
|
El Dorado | $3,237 | $1,255 | 09/22/2008 | 07/15/2009 |
Electronic Fareboxes
|
El Dorado | $519 | $261 | 01/15/2012 | 12/31/2014 |
Engine/Parts Cleaner Installation
|
El Dorado | $200 | $200 | 03/01/2013 | 04/30/2013 |
Lake Tahoe Community College (LTCC) Mobility Hub
|
El Dorado | $1,462 | $1,058 | 01/23/2019 | 12/30/2020 |
Local Route Expansion Vehicle
|
El Dorado | $562 | $199 | 07/01/2011 | 05/15/2012 |
NABI Engine Replacement
|
El Dorado | $261 | $250 | 01/23/2019 | 12/31/2022 |
Paratransit Vehicle Replacement
|
El Dorado | $200 | $36 | 01/08/2011 | 07/01/2011 |
Park & Ride Facility Construction
|
El Dorado | $1,470 | $1,431 | 02/01/2018 | 11/04/2019 |
Replacement Bus Purchase
|
El Dorado | $2,658 | $2,305 | 05/15/2015 | 04/15/2017 |
Smart Card Program Implementation
|
El Dorado | $347 | $249 | 07/01/2011 | 07/31/2017 |
Social Service/transit Vehicle Replace.
|
El Dorado | $153 | $126 | 07/01/2008 | 06/01/2009 |
TTD-BlueGO Transit System Vehicle Purchases
|
El Dorado | $268 | $62 | 03/01/2010 | 06/30/2015 |
Transit Facility Upgrade/Expansion
|
El Dorado | $752 | $750 | 06/23/2014 | 10/31/2014 |
Transit Rolling Stock Replacment
|
El Dorado | $612 | $348 | 11/01/2008 | 01/31/2010 |
Vehicle Replacement
|
El Dorado | $763 | $120 | 11/02/2009 | 03/02/2011 |
(8) 35-Passenger Low Floor CNG Buses
|
Fresno | $3,756 | $1,743 | 08/07/2015 | 08/21/2015 |
Administrative Office Expansion
|
Fresno | $2,660 | $2,508 | 09/01/2020 | 12/31/2021 |
Associated Transit Improvements (HFN)
|
Fresno | $1,250 | $1,250 | 02/01/2018 | 09/30/2021 |
BRT Improvements
|
Fresno | $14,890 | $9,640 | 08/01/2015 | 10/31/2016 |
Bus Stop Improvement
|
Fresno | $1,988 | $837 | 01/01/2020 | 06/30/2021 |
Bus Stop Improvements
|
Fresno | $97 | $94 | 07/02/2011 | 09/30/2011 |
Bus Wash/Vault Facility Upgrades
|
Fresno | $1,762 | $1,538 | 02/28/2022 | 01/31/2023 |
CNG Engine Retrofits
|
Fresno | $1,887 | $1,800 | 11/01/2011 | 06/30/2012 |
CNG Replacement Buses
|
Fresno | $2,599 | $2,500 | 09/20/2008 | 06/01/2009 |
CNG Replacement Fueling Units
|
Fresno | $524 | $470 | 09/01/2016 | 12/01/2018 |
City of Fresno/FAX/Paratransit Facility
|
Fresno | $3,145 | $3,145 | 05/01/2011 | 11/30/2016 |
Clovis Transit Rolling Stock
|
Fresno | $1,669 | $735 | 06/17/2008 | 03/01/2009 |
Dispatch Software and MDT's
|
Fresno | $20 | $20 | 12/01/2013 | 08/30/2014 |
Downtown Circulator
|
Fresno | $11,245 | $526 | 01/01/2015 | 03/31/2022 |
Electric Charging Stations
|
Fresno | $766 | $766 | 08/01/2016 | 10/01/2016 |
Employment Shuttle Vehicle
|
Fresno | $546 | $365 | 10/26/2013 | 08/06/2014 |
FCRTA's 4 - CNG Pumps
|
Fresno | $33 | $33 | 03/01/2008 | 05/01/2008 |
FCRTA's 5 Rolling Stock Replacement Cut-Away V
|
Fresno | $649 | $378 | 03/01/2008 | 03/16/2009 |
FCRTA's Rolling Stock Replacement Cut-Away Vans
|
Fresno | $963 | $963 | 06/26/2008 | 03/16/2009 |
Install FuelMaker CNG Pumps
|
Fresno | $397 | $267 | 06/01/2011 | 06/27/2013 |
Install Parking Shelters with Solar Panels
|
Fresno | $1,680 | $1,600 | 12/01/2020 | 03/31/2022 |
Low-Floor Passenger Vehicles
|
Fresno | $3,408 | $3,408 | 08/30/2013 | 08/06/2014 |
Mendota Transit Service Expansion
|
Fresno | $1,474 | $411 | 05/30/2008 | 09/30/2008 |
One 30ft. BYD Electric Bus
|
Fresno | $508 | $374 | 03/01/2020 | 09/15/2020 |
Passenger Amenities & Bus Stop Improvements
|
Fresno | $1,258 | $174 | 03/01/2022 | 05/31/2022 |
Purchase CNG Paratransit Vehicles
|
Fresno | $617 | $71 | 12/01/2013 | 09/30/2016 |
Purchase New 60' CNG Articulated Buses
|
Fresno | $2,792 | $451 | 10/01/2016 | 07/01/2018 |
Purchase Refurbished 60' Articulated Buses
|
Fresno | $0 | $0 | 03/01/2014 | 07/31/2014 |
Purchase Replacement Paratransit Buses
|
Fresno | $192 | $20 | 04/01/2011 | 01/01/2012 |
Purchase Six 40' CNG Replacement Buses
|
Fresno | $1,055 | $1,055 | 12/01/2010 | 01/31/2015 |
Purchase Support Vehicles
|
Fresno | $1,063 | $950 | 01/31/2018 | 09/30/2022 |
Purchase Two 30' CNG Replacement Buses
|
Fresno | $445 | $120 | 09/30/2010 | 02/28/2012 |
Purchase of Replacement Support Vehicles
|
Fresno | $82 | $16 | 03/01/2011 | 05/01/2014 |
Purchase/Install 3-Position Bike Racks
|
Fresno | $132 | $18 | 04/30/2012 | 09/30/2013 |
Purchase/Install CNG Compressor
|
Fresno | $554 | $55 | 06/01/2016 | 10/31/2016 |
Purchase/Install Shop Equipment
|
Fresno | $116 | $23 | 10/01/2011 | 05/01/2014 |
Remodel Main FAX Facility
|
Fresno | $3,306 | $2,780 | 03/31/2022 | 03/31/2023 |
Replace CAD/AVL System Fleetwide
|
Fresno | $3,064 | $2,945 | 10/01/2020 | 12/31/2022 |
Replace Vehicles - Fixed Route & Paratransit
|
Fresno | $3,151 | $2,952 | 10/01/2019 | 01/31/2023 |
Rolling Stock Replacement Vans
|
Fresno | $863 | $387 | 06/28/2008 | 03/16/2009 |
Transit Vehicle Purchase (Phase 3)
|
Fresno | $353 | $353 | 03/30/2014 | 06/30/2014 |
Transit Vehicle Purchase (Phase 4)
|
Fresno | $90 | $89 | 03/01/2014 | 03/31/2014 |
Transit Vehicle Purchase Phase 2
|
Fresno | $935 | $720 | 02/01/2012 | 03/01/2012 |
Transit Way Finding Implementation
|
Fresno | $176 | $77 | 09/30/2015 | 06/30/2016 |
Vehicles with Heavy Duty Lifts
|
Fresno | $584 | $464 | 10/26/2013 | 08/06/2014 |
Zonar System (Safety Implimentation)
|
Fresno | $49 | $48 | 09/01/2010 | 10/01/2010 |
Bus Barn Construction Phase I
|
Glenn | $568 | $473 | 04/01/2017 | 04/30/2018 |
Glen Ride Enhancement
|
Glenn | $397 | $361 | 01/01/2009 | 06/01/2009 |
Glenn Ride Vehicle Replacement
|
Glenn | $846 | $546 | 07/01/2011 | 10/01/2012 |
ADA Bus Stop Improvements
|
Humboldt | $205 | $201 | 04/30/2018 | 06/26/2018 |
Bus Procurement
|
Humboldt | $56 | $55 | 11/15/2015 | 12/15/2015 |
Bus Replacement (40 ft. 38-Passenger)
|
Humboldt | $500 | $500 | 05/01/2015 | 06/01/2015 |
Bus Replacement (40')
|
Humboldt | $527 | $527 | 10/01/2014 | 11/01/2014 |
Bus Replacement (30ft 24-passenger)
|
Humboldt | $77 | $77 | 05/01/2015 | 12/31/2015 |
Bus Shelter Improvement
|
Humboldt | $560 | $555 | 07/01/2011 | 07/01/2012 |
Bus Stop Improvement
|
Humboldt | $100 | $100 | 05/01/2011 | 12/31/2011 |
Bus Stop Improvements
|
Humboldt | $155 | $155 | 06/30/2017 | 02/28/2019 |
Dispatch Equipment Upgrade
|
Humboldt | $0 | $0 | 11/15/2015 | 12/15/2015 |
Fuel Facility
|
Humboldt | $80 | $76 | 10/01/2015 | 11/01/2015 |
GPS Tracking System
|
Humboldt | $486 | $462 | 01/01/2011 | 09/30/2011 |
GPS/AVL Tracking System
|
Humboldt | $208 | $147 | 12/01/2010 | 05/01/2011 |
Office Enhancement & ADA Project
|
Humboldt | $124 | $115 | 04/01/2016 | 05/01/2016 |
Purchase One 30 foot hybrid replacement buses
|
Humboldt | $166 | $166 | 07/01/2012 | 10/01/2012 |
Purchase One Diesel/Electric Buses
|
Humboldt | $452 | $451 | 08/01/2013 | 05/31/2014 |
Purchase of Two 40' Buses
|
Humboldt | $1,874 | $1,691 | 08/01/2013 | 05/01/2014 |
Replacement 35 foot bus
|
Humboldt | $948 | $941 | 08/23/2013 | 05/16/2014 |
Rolling Stock Procurement
|
Humboldt | $834 | $823 | 07/01/2009 | 10/01/2010 |
Rolling Stock Procurement
|
Humboldt | $773 | $226 | 10/01/2008 | 11/28/2009 |
Rolling Stock Procurement
|
Humboldt | $357 | $113 | 10/01/2008 | 10/01/2009 |
Vehicle Replacement
|
Humboldt | $50 | $50 | 05/15/2015 | 06/15/2015 |
Brawley Transit Transfer Terminal
|
Imperial | $1,233 | $511 | 01/31/2013 | 06/01/2013 |
Cutaway Vehicle Procurement
|
Imperial | $1,682 | $1,680 | 06/01/2014 | 11/01/2015 |
IVC Bus Transfer Terminal
|
Imperial | $1,164 | $1,164 | 06/01/2009 | 06/30/2010 |
Imperial Transit Park
|
Imperial | $1,350 | $243 | 08/01/2018 | 06/01/2019 |
Imperial Valley College Bus Transfer Terminal (Phase II)
|
Imperial | $1,112 | $920 | 07/31/2011 | 04/30/2012 |
MV-1 Vehicle Procurement
|
Imperial | $52 | $50 | 06/01/2014 | 11/01/2014 |
Purchase Cutaway Transit Buses
|
Imperial | $933 | $933 | 06/30/2014 | 11/30/2014 |
Transit Bus Procurement
|
Imperial | $2,606 | $2,400 | 06/01/2014 | 11/01/2014 |
Vehicle and/or Vehicle Technology Acquisition
|
Imperial | $1,372 | $71 | 11/01/2022 | 08/01/2023 |
Bishop Dial A Ride Vehicle Replacement
|
Inyo | $165 | $84 | 09/01/2021 | 06/30/2023 |
Diesel Bus Filters
|
Inyo | $29 | $11 | 01/31/2011 | 09/30/2011 |
ESTA Bishop Facility Improvements
|
Inyo | $503 | $503 | 01/01/2016 | 12/01/2021 |
Mobile High Pressure Wash
|
Inyo | $20 | $20 | 01/31/2011 | 08/30/2011 |
Scheduling Software
|
Inyo | $57 | $17 | 06/01/2012 | 07/01/2012 |
Security Lighting and Fencing Project
|
Inyo | $63 | $12 | 11/01/2011 | 11/01/2012 |
Support Vehicles
|
Inyo | $56 | $56 | 06/01/2012 | 07/01/2012 |
Vehicle Purchase
|
Inyo | $263 | $261 | 05/05/2008 | 06/04/2009 |
Vehicle Purchase
|
Inyo | $81 | $75 | 10/01/2010 | 04/30/2011 |
Vehicle Purchase
|
Inyo | $40 | $32 | 04/01/2008 | 11/01/2008 |
1 CNG Bus Replacement
|
Kern | $448 | $239 | 05/01/2010 | 06/28/2011 |
3 Hydrogen Electric/5 Gal Buses
|
Kern | $1,617 | $1,617 | 08/01/2020 | 11/01/2021 |
AC Recharging Unit
|
Kern | $5 | $5 | 04/15/2015 | 06/02/2015 |
ARRA Match for Purchase of 6 Diesel Buses
|
Kern | $605 | $45 | 04/27/2011 | 09/30/2011 |
Access Control System/Fleet Computer Tablets
|
Kern | $6 | $6 | 04/30/2016 | 07/01/2016 |
Arvin's Transit Safety & Security Improvements
|
Kern | $30 | $29 | 04/12/2018 | 09/30/2019 |
Automated Passenger Counters
|
Kern | $0 | $0 | 03/01/2016 | 05/31/2016 |
Battery Electric Van Replacement Purchase
|
Kern | $224 | $114 | 04/15/2022 | 09/01/2022 |
Bus Covered Parking
|
Kern | $9 | $9 | 02/01/2015 | 06/01/2015 |
Bus Purchase A -- Two 32-passenger CNG Buses
|
Kern | $473 | $467 | 05/03/2012 | 03/30/2013 |
Bus Purchase B - One CNG 47-Passenger Over-the-Road Coach
|
Kern | $473 | $465 | 05/03/2012 | 03/30/2013 |
Bus Purchase C - One 32-Passenger CNG Bus
|
Kern | $473 | $459 | 05/03/2012 | 03/30/2013 |
Bus Rehab-Electronic Sign Replacement
|
Kern | $9 | $9 | 04/01/2015 | 06/30/2015 |
Bus Shelter
|
Kern | $17 | $17 | 04/01/2016 | 04/30/2016 |
Bus Shelter Enhancement
|
Kern | $1,834 | $87 | 06/05/2018 | 01/31/2019 |
Bus Shelters Purchase
|
Kern | $11 | $11 | 02/01/2012 | 03/31/2012 |
Bus Shelters with Solar Lighting
|
Kern | $30 | $15 | 03/15/2016 | 05/01/2016 |
Bus Transit Shelter
|
Kern | $5 | $5 | 02/02/2015 | 02/04/2015 |
Bus Turnout on Sherwood Avenue
|
Kern | $61 | $59 | 03/01/2010 | 03/31/2010 |
CMAQ Match for Purchase of 3 CNG Buses
|
Kern | $1,430 | $424 | 10/01/2012 | 03/01/2014 |
CNG Bus Lift (Bakerfield)
|
Kern | $113 | $104 | 07/01/2009 | 07/19/2010 |
CNG Bus Replacement (15 Buses)
|
Kern | $7,682 | $5,932 | 10/18/2011 | 02/05/2014 |
CNG Bus Replacement (5)
|
Kern | $2,377 | $2,162 | 02/21/2012 | 02/21/2012 |
CNG Bus Service Area Enclosure(Bakerfield)
|
Kern | $4 | $4 | 02/15/2010 | 09/30/2010 |
CNG Replacement Buses
|
Kern | $14,401 | $1,200 | 02/05/2018 | 03/05/2018 |
CNG Site Replacement
|
Kern | $340 | $337 | 05/01/2015 | 12/01/2016 |
CTSA Replacement Vehicles Four Paratransit Vehicles
|
Kern | $231 | $220 | 10/01/2013 | 01/31/2014 |
City of Taft Bus Shelters
|
Kern | $5 | $5 | 07/16/2013 | 08/13/2013 |
Compressed Natural Gas (CNG) Bus Procurement
|
Kern | $2,146 | $2,146 | 03/09/2010 | 09/15/2010 |
Compressed Natural Gas Bus Procurement
|
Kern | $8,363 | $3,810 | 07/17/2008 | 09/30/2009 |
Construct Park-and-Ride
|
Kern | $524 | $505 | 10/01/2019 | 03/01/2020 |
Construct Parking Structure at Amtrak Station Multi-Modal Transit Center
|
Kern | $2,811 | $2,739 | 05/01/2015 | 08/01/2019 |
Construction of 10 Bus Bench Shelters
|
Kern | $106 | $104 | 05/01/2012 | 09/01/2016 |
Construction of 15 Bus Bench Shelters
|
Kern | $114 | $90 | 03/01/2015 | 06/30/2015 |
Construction of 6 Bus Bench Shelters
|
Kern | $58 | $48 | 03/01/2011 | 07/31/2012 |
Construction of Hub Station
|
Kern | $193 | $186 | 01/30/2016 | 01/30/2017 |
Construction of Maintenance Facility
|
Kern | $1,669 | $830 | 10/01/2015 | 12/30/2016 |
Corp Yard Security Enhancement Project
|
Kern | $14 | $11 | 10/01/2015 | 12/30/2016 |
Dial-a-Ride Fare Boxes & Security Cameras
|
Kern | $36 | $36 | 08/01/2016 | 09/30/2016 |
Downtown Transit Center
|
Kern | $2,562 | $1,401 | 11/01/2016 | 06/30/2018 |
Electric Bus & MicroTransit
|
Kern | $825 | $823 | 08/02/2019 | 10/12/2019 |
Electric Buses/Replacement of CNG Bus & Trans Track
|
Kern | $2,094 | $2,090 | 01/01/2016 | 05/01/2016 |
Electronic Fare Boxes
|
Kern | $1,281 | $1,253 | 05/01/2016 | 06/30/2016 |
Fuel Management System
|
Kern | $11 | $11 | 07/01/2013 | 08/26/2013 |
Garage Enhancement, Vehicle Purchase, Improve Transfer Station
|
Kern | $29 | $29 | 08/15/2011 | 09/01/2012 |
Golden Empire Transit Bus Stop Improvements
|
Kern | $574 | $561 | 10/01/2015 | 04/01/2020 |
Intelligent Transportation System
|
Kern | $572 | $128 | 04/30/2015 | 09/30/2015 |
Local Match for CMAQ Park & Ride
|
Kern | $40 | $39 | 01/01/2015 | 08/31/2015 |
Master Plan Facility Design
|
Kern | $1,251 | $1,251 | 12/01/2019 | 12/31/2019 |
Match for CMAQ Bus Purchase
|
Kern | $1,669 | $46 | 09/01/2014 | 06/30/2015 |
Modernization Improvement for Route Match of DART Fixed Routes
|
Kern | $58 | $36 | 11/01/2014 | 02/28/2015 |
Purchase (2) 14 Passenger Buses
|
Kern | $177 | $176 | 07/10/2015 | 03/22/2019 |
Purchase 2 El Dorado Aero Elite 25' Buses
|
Kern | $122 | $119 | 12/01/2015 | 01/31/2016 |
Purchase 2 Transit Buses
|
Kern | $161 | $161 | 05/19/2015 | 07/31/2015 |
Purchase Bus Lift and R134 A/C Machine
|
Kern | $20 | $20 | 03/01/2011 | 07/28/2011 |
Purchase New Dial-a-Ride Bus
|
Kern | $53 | $53 | 06/01/2020 | 12/31/2020 |
Purchase New Transit Bus
|
Kern | $66 | $54 | 12/04/2008 | 05/19/2009 |
Purchase Two 8-passenger vehicles
|
Kern | $51 | $51 | 04/11/2012 | 10/31/2012 |
Purchase Two Gasoline Buses
|
Kern | $202 | $194 | 01/01/2016 | 06/30/2016 |
Purchase a Bus
|
Kern | $90 | $90 | 08/01/2011 | 07/01/2013 |
Purchase of 3 Multi-fuel Vehicles
|
Kern | $52 | $52 | 06/02/2010 | 08/19/2010 |
Purchase of 6 Diesel Buses
|
Kern | $650 | $650 | 01/30/2012 | 06/30/2012 |
Purchase of 6 Diesel Mini Buses
|
Kern | $605 | $109 | 03/15/2011 | 07/31/2011 |
Purchase of 7 Diesel Mini - Buses(Bakerfield)
|
Kern | $827 | $347 | 11/30/2008 | 07/15/2009 |
Purchase of Four 12-Passenger Vans(Bakerfield)
|
Kern | $191 | $185 | 06/30/2008 | 07/31/2009 |
Purchase of Tire Changing Machine for Central Garage
|
Kern | $9 | $9 | 03/01/2010 | 05/04/2010 |
Purchase of Two Additional Buses
|
Kern | $181 | $163 | 08/06/2012 | 11/30/2012 |
Purchase of a Ford Bus
|
Kern | $90 | $36 | 08/01/2011 | 07/01/2013 |
Replace 3 Wheelchair Lifts on Buses
|
Kern | $14 | $14 | 02/02/2015 | 07/09/2015 |
Retrofitting 9 Diesel Buses
|
Kern | $77 | $75 | 06/01/2009 | 09/30/2009 |
Route Match Management System
|
Kern | $80 | $79 | 07/01/2015 | 09/01/2015 |
Securing Corporation Yard/Bus Storage Facility
|
Kern | $72 | $58 | 06/01/2012 | 10/16/2012 |
Shafter Transit Connect Electric Dial-A-Ride
|
Kern | $420 | $412 | 07/01/2015 | 05/01/2016 |
Solar Energy Installation-Transit Bldg Park & Ride
|
Kern | $100 | $100 | 07/05/2017 | 07/14/2017 |
Transit Connect Vehicles
|
Kern | $72 | $72 | 08/07/2015 | 10/01/2015 |
Transit Facility Enhancement - Security Fencing
|
Kern | $9 | $9 | 04/01/2018 | 06/01/2020 |
Transit Maintenance Facility Modernization(BK)
|
Kern | $280 | $249 | 02/15/2010 | 07/01/2012 |
Transit Shelter Maintenance
|
Kern | $12 | $4 | 05/01/2015 | 06/01/2015 |
Twelve Bus Purchase
|
Kern | $3,694 | $3,694 | 09/01/2014 | 06/30/2015 |
Vehicle Security Fencing
|
Kern | $433 | $423 | 12/10/2010 | 05/01/2018 |
Westway Station -- Multi-Modal Transit Center
|
Kern | $558 | $558 | 02/01/2013 | 08/31/2013 |
Auto Bus Wash System and Bus Shelter
|
Kings | $731 | $731 | 05/01/2014 | 12/31/2014 |
Automatic Fare Collection Equipment
|
Kings | $668 | $127 | 11/16/2010 | 01/27/2011 |
Bus Stop Amenities
|
Kings | $655 | $650 | 07/01/2012 | 03/01/2016 |
Diagnostic Equipment for Buses, Lift Certification, Bottle Jack, Lighting for buses and Maintenance
|
Kings | $39 | $39 | 06/28/2018 | 05/14/2019 |
Hand held radios and flexi glass at Depot
|
Kings | $27 | $27 | 10/01/2017 | 07/30/2020 |
Handicap Doors
|
Kings | $24 | $24 | 11/01/2012 | 12/01/2012 |
Install Mobile Data Terminal
|
Kings | $473 | $473 | 01/01/2010 | 12/30/2010 |
Intelligent Transportation System
|
Kings | $706 | $705 | 02/01/2014 | 04/01/2016 |
New Bus Purchase
|
Kings | $1,484 | $1,484 | 11/28/2012 | 12/23/2013 |
New Bus Purchase
|
Kings | $2,581 | $1,494 | 09/01/2015 | 12/01/2015 |
Repaving Corporate Yard
|
Kings | $209 | $209 | 04/24/2018 | 08/28/2018 |
Replacement Older 35' Transit Buses
|
Kings | $3,099 | $355 | 07/01/2007 | 04/01/2008 |
Replacement of (2) Wheelchair Lifts
|
Kings | $57 | $57 | 10/11/2018 | 12/01/2018 |
Replacement of Older Dial-A-Ride Buses
|
Kings | $467 | $466 | 09/18/2008 | 04/01/2010 |
Reseal Parking Lot/Cameras Install at Depot
|
Kings | $32 | $32 | 06/28/2018 | 05/14/2019 |
Retrofit older buses with new flooring
|
Kings | $7 | $7 | 11/13/2018 | 05/01/2019 |
Transit Facility Improvement
|
Kings | $3,083 | $1,573 | 01/01/2016 | 06/01/2016 |
Transit Phone System
|
Kings | $123 | $123 | 06/01/2020 | 11/30/2021 |
Construct Bus Stop and Shelters
|
Lake | $94 | $50 | 09/24/2011 | 06/30/2012 |
Purchase 1 Replacement Bus
|
Lake | $150 | $145 | 03/15/2010 | 06/30/2011 |
Purchase 5 Replacement Buses
|
Lake | $2,743 | $1,745 | 09/24/2010 | 09/15/2017 |
Purchase Buses
|
Lake | $2,223 | $538 | 04/01/2020 | 03/01/2021 |
Purchase Buses
|
Lake | $606 | $546 | 03/26/2008 | 03/30/2009 |
Transit Hub Right of Way Acquisition
|
Lake | $200 | $200 | ||
2016 Rolling Stock
|
Lassen | $293 | $293 | 06/15/2016 | 03/16/2017 |
2018 Rolling Stock Purchase
|
Lassen | $333 | $320 | 08/12/2019 | 07/23/2020 |
Bus Stop Improvements 2017
|
Lassen | $389 | $87 | 04/01/2020 | 06/30/2022 |
LRB Bus Shelters
|
Lassen | $87 | $55 | 03/01/2017 | 06/30/2022 |
LRB Maintenance Facility Expansion
|
Lassen | $303 | $278 | 03/14/2016 | 09/11/2018 |
LRB Office Facility Flooring
|
Lassen | $11 | $11 | 06/26/2014 | 07/03/2014 |
LRB Transit Facility
|
Lassen | $47 | $47 | 06/02/2009 | 08/30/2009 |
Lassen Rural Bus (LRB) Back-up Power Generator
|
Lassen | $83 | $22 | 08/05/2014 | 08/25/2014 |
Rolling Stock Purchase
|
Lassen | $454 | $454 | 06/26/2014 | 08/30/2014 |
Transit Bus Purchase
|
Lassen | $422 | $145 | 12/19/2011 | 07/20/2012 |
Transit Operations Software
|
Lassen | $88 | $88 | 02/28/2015 | 03/30/2015 |
(6) Mid-size Sedans for Transit (Support Vehicles)
|
Los Angeles | $197 | $197 | 05/01/2016 | 06/01/2016 |
2017 Purchase 4 CNG Vehicles
|
Los Angeles | $735 | $30 | 11/30/2017 | 12/30/2018 |
2017 Replace 4 Transit Vehicles
|
Los Angeles | $426 | $330 | 05/21/2018 | 09/20/2018 |
2017 Transit Vehicle Purchase
|
Los Angeles | $65 | $13 | 12/31/2017 | 06/30/2018 |
2020 Capital Replacement Project - 6 Vehicles
|
Los Angeles | $768 | $28 | 05/01/2022 | 07/31/2023 |
Accessible Supervisory Vehicles
|
Los Angeles | $369 | $362 | 12/31/2022 | 06/30/2023 |
Admin/Operations/Maintenance Facility Phase II Construction
|
Los Angeles | $10,815 | $1,212 | 10/31/2011 | 11/30/2012 |
Alternate Fuel Bus Replacement Project
|
Los Angeles | $4,546 | $801 | 12/01/2015 | 08/31/2016 |
Alternate Fuel Vehicles (7)
|
Los Angeles | $611 | $424 | 07/01/2013 | 02/01/2014 |
Arcadia Transit Bus Replacement
|
Los Angeles | $516 | $501 | 06/28/2019 | 10/31/2019 |
Automated Dispatch System (Trapeze)
|
Los Angeles | $46 | $46 | 08/01/2008 | 07/01/2010 |
Big Blue Bus-Bus Replacement
|
Los Angeles | $19,821 | $2,670 | 06/09/2009 | 03/01/2012 |
Bus Procurement
|
Los Angeles | $85,671 | $49,243 | 05/15/2007 | 03/07/2008 |
Bus Procurement (FY11)
|
Los Angeles | $311,117 | $135,132 | 01/01/2013 | 06/01/2016 |
Bus Procurement 45ft CNG
|
Los Angeles | $173,302 | $20,000 | 04/24/2008 | 08/25/2010 |
Bus Rehab - ADA Equipment
|
Los Angeles | $123 | $12 | 12/01/2012 | 03/01/2013 |
Bus Rehab Program
|
Los Angeles | $23,991 | $18,857 | 07/01/2008 | 08/30/2011 |
Bus Rehabilitation Program
|
Los Angeles | $28,157 | $26,157 | 07/01/2007 | 06/30/2008 |
Bus Rehabilitation Program (FY11)
|
Los Angeles | $52,976 | $52,520 | 07/01/2011 | 02/01/2014 |
Bus Replacement
|
Los Angeles | $3,366 | $486 | 03/01/2008 | 09/30/2009 |
Bus Replacement - BRT Light
|
Los Angeles | $6,682 | $1,294 | 04/01/2017 | 06/30/2020 |
Bus Replacement Alternative Fuel
|
Los Angeles | $21,313 | $13,140 | 10/01/2012 | 06/30/2016 |
Bus Security Camera System
|
Los Angeles | $950 | $150 | 06/01/2014 | 10/01/2014 |
Bus Shelter Improvement Project (Landmarks)
|
Los Angeles | $688 | $60 | 05/01/2017 | 03/01/2018 |
Bus Signal Priority
|
Los Angeles | $2,297 | $550 | 12/01/2018 | 06/30/2023 |
Bus Stop Improvement Program
|
Los Angeles | $3,168 | $98 | 11/05/2017 | 12/31/2023 |
Bus Stop Signage Improvement
|
Los Angeles | $195 | $180 | 11/01/2017 | 06/30/2018 |
Bus Wash Facility Upgrade
|
Los Angeles | $815 | $412 | 10/31/2017 | 06/30/2022 |
Bus Wash Replacement
|
Los Angeles | $979 | $109 | 06/01/2015 | 03/01/2016 |
CNG Vehicle Refueling Station and Facility Shop Upgrades
|
Los Angeles | $3,501 | $704 | 09/01/2013 | 10/01/2014 |
Cancelled - Grant Rea Park Terminal Rehab
|
Los Angeles | $0 | $0 | 10/01/2020 | 03/01/2021 |
Cancelled - Pico Terminal Rehabilitation
|
Los Angeles | $0 | $0 | 10/01/2020 | 03/01/2022 |
Cancelled - Transit Facility Rehab
|
Los Angeles | $0 | $0 | 03/01/2018 | 09/30/2018 |
City of Santa Monica - Big Blue Bus Replacement
|
Los Angeles | $21,720 | $13,298 | 03/01/2010 | 11/30/2021 |
City-Wide Bus Stop Enhancements
|
Los Angeles | $255 | $147 | 01/01/2023 | 07/01/2023 |
Clean Fuel Bus Replacement
|
Los Angeles | $24,575 | $2,371 | 05/01/2007 | 10/01/2009 |
Commerce Bus Shelter Program
|
Los Angeles | $136 | $136 | 07/28/2014 | 10/30/2014 |
Crenshaw/LAX Transit Corridor
|
Los Angeles | $1,985,571 | $128,517 | 07/13/2013 | 10/01/2022 |
Data Communication - Intellegent Transportation Systems Phase I
|
Los Angeles | $75 | $75 | 07/01/2015 | 09/01/2015 |
Design and Retrofit Fare Collection
|
Los Angeles | $249 | $249 | 01/15/2013 | 08/01/2013 |
Heavy Bus Lift Purchase
|
Los Angeles | $107 | $52 | 05/01/2017 | 05/12/2017 |
ITS Replacement
|
Los Angeles | $2,455 | $1,342 | 04/01/2012 | 05/30/2012 |
Install Frangible Tables in Metrolink Rail Cars for Enhanced Safety
|
Los Angeles | $1,330 | $500 | 07/01/2009 | 06/01/2010 |
Intelligent Transportation System
|
Los Angeles | $1,377 | $980 | 05/01/2020 | 06/30/2021 |
Intermodal Aerial Station
|
Los Angeles | $4,000 | $100 | 07/01/2009 | 06/01/2012 |
Keller Street Yard
|
Los Angeles | $13,379 | $5,660 | 09/13/2009 | 02/18/2011 |
LBT Headquarters Building
|
Los Angeles | $13,159 | $9,047 | 07/01/2020 | 02/18/2022 |
LNG/CNG Fueling Station
|
Los Angeles | $3,387 | $330 | 04/01/2010 | 09/01/2010 |
Lobby: ADA Counter & Private Offices
|
Los Angeles | $421 | $403 | 06/01/2015 | 03/01/2016 |
Maintenance Hose Reels Replacement (RFP) No. 23-2
|
Los Angeles | $85 | $35 | 12/20/2022 | 04/20/2023 |
Metrolink Revitalization - ADA Upgrades
|
Los Angeles | $103 | $103 | 04/01/2015 | 06/30/2015 |
Mid City/Expo LRT Project Phase 2
|
Los Angeles | $1,086,417 | $135,983 | 03/01/2010 | 11/01/2015 |
Mid City/Expo LRT Project Phase 1
|
Los Angeles | $850,688 | $138,463 | 02/01/2006 | 06/01/2013 |
Midlife Bus Upgrade
|
Los Angeles | $2,013 | $2,013 | 06/01/2018 | 09/30/2020 |
New Bus Operations & Maintenance Facility (Division 13)
|
Los Angeles | $120,356 | $52,765 | 03/01/2010 | 05/01/2015 |
New Flyer Bus Purchase
|
Los Angeles | $5,290 | $517 | 09/08/2008 | 08/31/2010 |
Passenger Information Systems
|
Los Angeles | $2,015 | $242 | 08/22/2012 | 03/31/2014 |
Passenger Station Pedestrian Walkway
|
Los Angeles | $211 | $43 | 06/01/2015 | 03/01/2016 |
Pedestrian Plaza Improvements
|
Los Angeles | $501 | $100 | 06/01/2015 | 03/01/2016 |
Purchase 8 - 40ft replacement buses
|
Los Angeles | $4,805 | $432 | 08/01/2009 | 12/01/2010 |
Purchase Replacement Transit Vehicles
|
Los Angeles | $1,305 | $216 | 06/09/2014 | 01/30/2015 |
Purchase Replacement Transit Vehicles
|
Los Angeles | $2,138 | $52 | 03/31/2012 | 04/30/2013 |
Purchase Two CNG Buses
|
Los Angeles | $1,192 | $1,076 | 11/16/2021 | 11/30/2024 |
Purchase Two Electric Buses
|
Los Angeles | $1,415 | $1,408 | 02/01/2015 | 03/01/2015 |
Purchase a Replacement Bus
|
Los Angeles | $693 | $120 | 09/27/2018 | 09/27/2018 |
Purchase of 14 40-foot Buses
|
Los Angeles | $8,072 | $767 | 08/01/2008 | 09/01/2009 |
Purchase of 20 CNG Transit Buses
|
Los Angeles | $10,000 | $1,307 | 08/01/2011 | 04/01/2012 |
Purchase of 24 CNG Transit Buses
|
Los Angeles | $15,300 | $1,440 | 07/01/2013 | 03/01/2016 |
Purchase of Paratransit Vehicles
|
Los Angeles | $81 | $81 | 07/17/2009 | 05/10/2010 |
Purchase of Replacement Buses
|
Los Angeles | $4,335 | $966 | 09/01/2014 | 07/01/2016 |
Purchase up to 18 40ft CNG buses
|
Los Angeles | $13,331 | $1,406 | 01/01/2020 | 06/30/2020 |
Real Time Passenger Information System
|
Los Angeles | $268 | $93 | 12/30/2022 | 03/30/2023 |
Real-Time Bus Arrival Features
|
Los Angeles | $107 | $107 | 01/01/2018 | 06/30/2018 |
Real-Time Next Bus Arrival Information System
|
Los Angeles | $2,554 | $504 | 12/01/2018 | 06/01/2023 |
Regional Connector Transit Corridor
|
Los Angeles | $1,417,427 | $135,100 | 07/01/2014 | 04/01/2022 |
Regional Transit Center
|
Los Angeles | $30,207 | $2,984 | 08/01/2015 | 06/30/2019 |
Rehab Transportation Center
|
Los Angeles | $90 | $45 | 09/06/2011 | 09/01/2012 |
Rehabilitate Locomotives
|
Los Angeles | $16,854 | $6,144 | 10/08/2009 | 01/15/2011 |
Renovate/Rehab/Replace Project
|
Los Angeles | $428,572 | $35,866 | 05/17/2013 | 05/01/2023 |
Replace Bus Washer
|
Los Angeles | $284 | $57 | 01/01/2013 | 05/17/2013 |
Replace HVAC Unit - Claremont Train Depot
|
Los Angeles | $6 | $6 | 02/21/2013 | 02/28/2013 |
Replace HVAC on Vehicles
|
Los Angeles | $1,406 | $144 | 09/30/2018 | 12/31/2020 |
Replace incandescent signal lamps
|
Los Angeles | $871 | $871 | 02/01/2009 | 12/20/2012 |
Replacement Alternative Fuel Buses
|
Los Angeles | $70,827 | $16,290 | 12/01/2014 | 08/01/2021 |
Replacement Paratransit Vehicle
|
Los Angeles | $145 | $24 | 01/01/2014 | 02/01/2014 |
Replacement Paratransit Vehicles
|
Los Angeles | $500 | $85 | 11/02/2010 | 02/01/2011 |
Replacement Transit Buses
|
Los Angeles | $1,108 | $188 | 08/15/2011 | 11/30/2011 |
Replacement Vehicles - Paratransit
|
Los Angeles | $539 | $101 | 12/01/2008 | 01/09/2009 |
Rolling Stock Replacement
|
Los Angeles | $6,165 | $1,237 | 04/01/2012 | 05/30/2012 |
Rolling Stock Spare Parts
|
Los Angeles | $1,961 | $1,900 | 02/01/2008 | 01/01/2018 |
San Fernando Valley Extention North/South BRT
|
Los Angeles | $224,764 | $70,000 | 03/01/2010 | 06/30/2012 |
San Gabriel Valley Park&Ride
|
Los Angeles | $74,103 | $3,271 | 10/01/2012 | 12/01/2015 |
Sealed Corridor
|
Los Angeles | $19,953 | $1,138 | 11/01/2012 | 12/01/2015 |
Security Equipment - Fleet
|
Los Angeles | $4,074 | $336 | 04/28/2021 | 05/31/2021 |
Shop Modifications for CNG Vehicles
|
Los Angeles | $60 | $60 | 01/22/2009 | 01/31/2009 |
Three Remanufactured Electric Transit Buses
|
Los Angeles | $2,093 | $593 | 06/01/2019 | 07/01/2020 |
Transit Center Upgrades (HVAC)
|
Los Angeles | $11,847 | $1,441 | 01/26/2023 | 02/01/2025 |
Transit Fleet Modernization (Phase II)
|
Los Angeles | $4,039 | $2,458 | 08/21/2012 | 12/31/2012 |
Transit Fleet Modernization (Phase III)
|
Los Angeles | $505 | $386 | 08/21/2012 | 12/31/2012 |
Transit Vehicle Addition and Replacement
|
Los Angeles | $1,831 | $143 | 11/30/2010 | 09/02/2011 |
Transportation Management System
|
Los Angeles | $417 | $50 | 02/01/2013 | 12/31/2013 |
Transportation/Public Service Facility Improvements
|
Los Angeles | $502 | $128 | 06/01/2015 | 03/01/2016 |
Trolly Stop Improvements
|
Los Angeles | $65 | $31 | 09/22/2008 | 10/17/2008 |
Vehicle & Facility Security Upgrade
|
Los Angeles | $776 | $155 | 05/01/2008 | 09/30/2009 |
Wayside Signal Relocation
|
Los Angeles | $1,059 | $104 | 03/01/2010 | 06/30/2013 |
ZEB Chargers and Infrastructure Costs
|
Los Angeles | $191 | $0 | 08/01/2022 | 08/30/2022 |
Bus Shelter/Parking Lot Improvements
|
Madera | $1,272 | $1,050 | 07/31/2021 | 05/31/2023 |
CATX Facility Improvements
|
Madera | $251 | $251 | 09/30/2017 | 03/30/2018 |
CATX Transit Vehicle Shelter
|
Madera | $50 | $50 | 12/01/2009 | 02/01/2010 |
Chowchilla Area Transit Express (CATX) - Purchase One Van
|
Madera | $70 | $70 | 05/01/2011 | 08/31/2011 |
Construction of Bus Stop And Amenities in Fairmead
|
Madera | $20 | $20 | 04/01/2012 | 08/31/2012 |
FY 14/15 Bus Shelters
|
Madera | $152 | $143 | 09/01/2021 | 05/01/2023 |
Madera Co. Amtrak Station Improvements
|
Madera | $549 | $549 | 09/01/2013 | 02/19/2014 |
Madera County Building Facility Improvements
|
Madera | $500 | $499 | 07/30/2016 | 05/31/2023 |
Madera County Bus Bike Racks
|
Madera | $3 | $3 | 02/01/2015 | 12/01/2015 |
Madera County Bus Shelters
|
Madera | $101 | $100 | 09/01/2014 | 03/31/2015 |
Madera County Park and Ride Lots
|
Madera | $839 | $834 | 03/01/2021 | 04/30/2023 |
New Transit Facility
|
Madera | $1,506 | $1,506 | 11/12/2018 | 09/30/2019 |
Preventative Maintenance Equipment and Transit Amenities
|
Madera | $694 | $694 | 03/31/2023 | 05/31/2023 |
Purchase & Install MAX Bus Shelters & Amenities
|
Madera | $94 | $94 | 04/01/2012 | 10/31/2013 |
Purchase 1 New CATX Paratransit Gas 8 Passenger Van
|
Madera | $62 | $41 | 09/01/2022 | 11/01/2022 |
Purchase 1 Transit Bus
|
Madera | $89 | $89 | 03/01/2016 | 05/31/2017 |
Purchase 2 Madera Co. MCC Buses
|
Madera | $138 | $138 | 09/30/2008 | 06/30/2009 |
Purchase 2 Type VII CNG Buses/Amendent Project on 5/20/20008 to 2 Gas & 1 CNG Type VII Buses
|
Madera | $366 | $366 | 06/26/2008 | 12/30/2008 |
Purchase 3 MCC Transit Buses
|
Madera | $435 | $419 | 02/01/2015 | 12/31/2015 |
Vehicle Procurement
|
Madera | $160 | $0 | 09/01/2022 | 05/31/2023 |
(1) 34-Passenger Shuttle Vehicle for West Marin/Muir Woods Services
|
Marin | $367 | $365 | 05/01/2011 | 12/01/2012 |
(2) 34' Passenger Shuttles for West Marin/Muir Woods Services
|
Marin | $716 | $609 | 12/01/2010 | 09/30/2012 |
D1 Main Shop Roof Replacement
|
Marin | $915 | $615 | 10/01/2014 | 10/30/2015 |
GGBGTD - Marin Canal Neighborhood Improvements
|
Marin | $833 | $645 | 07/29/2013 | 11/15/2013 |
GGBHTD Body Shop Roof and Skylights Replacement
|
Marin | $772 | $414 | 06/24/2009 | 11/01/2011 |
GGBHTD Build Data Center
|
Marin | $2,516 | $1,600 | 04/23/2009 | 04/30/2011 |
GGBHTD Bus Purchase
|
Marin | $13,518 | $1,264 | 09/11/2009 | 06/30/2010 |
GGBHTD Ferry Vessel Replacement
|
Marin | $24,135 | $2,116 | 04/22/2010 | 04/13/2012 |
GGBHTD Two 18 Passenger Shuttle Vehicles
|
Marin | $153 | $152 | 06/01/2008 | 12/01/2008 |
GGBHTD/Purchase 16 ADA Paratransit Vehicles
|
Marin | $1,280 | $244 | 07/01/2014 | 12/31/2014 |
Local Bus Stop Revitalization
|
Marin | $2,040 | $400 | 07/01/2012 | 02/01/2019 |
M.V. Mendocino Mid-Life Refurbishment
|
Marin | $7,058 | $2,774 | 02/20/2015 | 09/30/2015 |
MS Marin Repower
|
Marin | $13,334 | $1,327 | 08/01/2018 | 09/30/2018 |
MS San Francisco Refurbishment
|
Marin | $20,377 | $7,820 | 09/03/2017 | 10/23/2017 |
Marin City Transit Hub
|
Marin | $669 | $75 | 09/01/2011 | 04/01/2012 |
Marin County Bus Stop Improvements
|
Marin | $2,809 | $2,021 | 07/01/2016 | 06/30/2017 |
Purchase (1) 18 Passenger Shuttle
|
Marin | $103 | $103 | 12/01/2012 | 06/30/2013 |
Purchase (32) 45' Over the Road Coaches
|
Marin | $18,867 | $3,207 | 05/01/2011 | 06/30/2012 |
Purchase 14 (40ft) Transit Vehicles
|
Marin | $6,514 | $1,158 | 06/01/2014 | 03/31/2016 |
Purchase 14 ADA Paratransit Vans
|
Marin | $1,219 | $350 | 12/20/2013 | 09/30/2014 |
Purchase 15 Para Transit Vehicles
|
Marin | $1,121 | $548 | 03/01/2016 | 08/31/2016 |
Purchase 2 30ft Transit Vehicles
|
Marin | $681 | $681 | 12/01/2012 | 06/30/2013 |
Purchase 29 -45' Buses
|
Marin | $16,798 | $1,732 | 05/01/2014 | 04/30/2015 |
Purchase 4 30ft transit vehicles
|
Marin | $1,515 | $300 | 07/01/2014 | 03/31/2016 |
Purchase One 30ft Transit Vehicle
|
Marin | $361 | $111 | 03/01/2016 | 08/31/2016 |
Purchase Seven 35 ft Hybrid Buses
|
Marin | $4,524 | $872 | 09/11/2009 | 06/01/2010 |
Purchase Two Muir Woods Shuttles
|
Marin | $615 | $601 | 01/01/2010 | 05/29/2010 |
Refurbishment of the MS Sonoma Ferry Boat
|
Marin | $29,197 | $3,870 | 06/01/2019 | 06/30/2021 |
MidPines YARTS Park & Ride Improvement
|
Mariposa | $197 | $197 | 09/01/2014 | 01/31/2018 |
Operations Center Generator
|
Mariposa | $158 | $155 | 02/01/2014 | 06/01/2014 |
Rehabiliatation of the Mariposa County Maintenance Yard
|
Mariposa | $275 | $275 | 03/01/2020 | 11/30/2020 |
Replace Pressure Washer/Steam Cleaner
|
Mariposa | $8 | $0 | 03/01/2021 | 05/31/2021 |
Transit Vehicle Replacement
|
Mariposa | $111 | $110 | 03/01/2021 | 05/31/2021 |
Transit/Vehicle Maintenance Yard Gate
|
Mariposa | $119 | $117 | 02/28/2012 | 08/30/2012 |
Facility Solarization & Modernation - Ukiah
|
Mendocino | $7,555 | $1,213 | 09/01/2011 | 08/31/2013 |
Four Large Van Purchase
|
Mendocino | $400 | $300 | 10/05/2015 | 11/30/2015 |
Four Vehicle Purchase
|
Mendocino | $419 | $90 | 11/01/2014 | 06/30/2015 |
One Dial-A-Ride and Three Large Vans
|
Mendocino | $310 | $307 | 05/05/2017 | 04/05/2018 |
Replace 40-foot Diesel Bus(es)
|
Mendocino | $2,444 | $2,422 | 04/01/2012 | 12/31/2012 |
Vehicle Replacement
|
Mendocino | $1,118 | $480 | 06/30/2018 | 11/29/2022 |
10-Bus Acquisition
|
Merced | $2,307 | $250 | 01/01/2008 | 06/30/2010 |
6 Paratransit Replacement Buses
|
Merced | $667 | $77 | 07/01/2009 | 07/01/2009 |
Bus Hoists & Administration Buidling
|
Merced | $324 | $152 | 09/22/2009 | 05/15/2010 |
Mobile Data Computers for Dial-A-Ride (DAR)
|
Merced | $168 | $137 | 09/01/2013 | 10/01/2013 |
Passenger Bus Shelter
|
Merced | $262 | $193 | 04/01/2008 | 03/31/2010 |
Purchase & Improvements of Operations and Maintenance Facility
|
Merced | $7,681 | $2,726 | 08/01/2017 | 11/15/2018 |
Purchase & Installation of Bus Shelters
|
Merced | $228 | $126 | 10/01/2010 | 04/30/2014 |
Purchase 10 D.A.R. Buses
|
Merced | $1,371 | $1,349 | 03/25/2016 | 11/30/2017 |
Purchase 11 Large D.A.R. Buses
|
Merced | $1,930 | $1,925 | 12/20/2013 | 07/31/2014 |
Purchase 13 D.A.R. Buses
|
Merced | $1,469 | $1,442 | 02/01/2015 | 02/01/2015 |
Purchase 3 Para Transit Buses
|
Merced | $296 | $292 | 10/01/2011 | 10/25/2011 |
Purchase 5 Gillig (40ft) Buses
|
Merced | $2,004 | $230 | 12/20/2013 | 07/31/2014 |
Purchase 6 D.A.R. Buses
|
Merced | $613 | $603 | 10/31/2015 | 11/30/2017 |
Purchase 8 Gillig (40ft) Buses
|
Merced | $2,740 | $314 | 01/31/2015 | 08/31/2015 |
Purchase 9 ADA Accessible Vans
|
Merced | $542 | $398 | 05/01/2017 | 11/01/2017 |
Purchase of New Buses for YARTS
|
Merced | $2,957 | $517 | 12/01/2011 | 03/31/2014 |
Purchase of Upgraded MDT's for AVL System
|
Merced | $319 | $282 | 02/01/2015 | 02/01/2015 |
Replace 2 Bluebird Q Buses
|
Merced | $800 | $788 | 12/20/2013 | 07/30/2014 |
Replace 6 ParaTransit Buses
|
Merced | $587 | $587 | 04/30/2011 | 05/31/2012 |
Expansion Vehicle
|
Modoc | $126 | $124 | 07/23/2009 | 11/24/2009 |
Modoc Transportation Center
|
Modoc | $1,564 | $351 | 10/01/2012 | 07/31/2013 |
Bishop Facility Improvements
|
Mono | $46 | $46 | 07/01/2015 | 08/01/2015 |
Mammoth & Bishop Facility Expansion
|
Mono | $441 | $392 | 09/01/2013 | 11/30/2013 |
Purchase and Install Bus Washing Equipment
|
Mono | $15 | $15 | 02/01/2014 | 10/01/2014 |
Rolling Stock Purchase
|
Mono | $193 | $177 | 06/01/2017 | 06/01/2018 |
Utility/Service Truck and Maintenance Equipment
|
Mono | $28 | $28 | 03/01/2013 | 09/01/2013 |
Bus Replacement & Bus-Related Equipment
|
Monterey | $27,610 | $6,154 | 02/01/2011 | 06/01/2017 |
Bus Shelters
|
Monterey | $252 | $250 | 11/01/2014 | 04/01/2018 |
Facilities Updates II
|
Monterey | $278 | $196 | 01/01/2018 | 06/30/2019 |
Frank J. Lichtanski Monetery Bay Operations Center
|
Monterey | $5,358 | $5,109 | 08/01/2012 | 08/01/2014 |
ITS Upgrade
|
Monterey | $2,306 | $2,115 | 09/01/2015 | 09/01/2017 |
MST BRT
|
Monterey | $5,480 | $2,331 | 07/01/2012 | 07/31/2014 |
MST Facilities Expansion and Rehabilitation
|
Monterey | $16,272 | $6,272 | 12/01/2016 | 04/01/2018 |
MST Farebox System Modernization & Expansion
|
Monterey | $1,657 | $644 | 05/01/2010 | 04/30/2011 |
MST South County Maintenance Facility
|
Monterey | $16,258 | $1,000 | 06/01/2020 | 12/01/2021 |
(3) Paratransit Vehicle Replacement
|
Napa | $227 | $210 | 12/29/2011 | 06/06/2012 |
Bus Stop Improvements
|
Napa | $159 | $127 | 12/01/2011 | 11/30/2012 |
Farebox Replacement Modernization Project
|
Napa | $1,328 | $803 | 04/09/2013 | 09/01/2013 |
NCTPA Hybrid Bus Purchase
|
Napa | $1,705 | $300 | 01/01/2008 | 07/01/2009 |
NCTPA Rolling Stock Acquisition
|
Napa | $555 | $555 | 01/01/2009 | 07/31/2009 |
Replacement Vehicles
|
Napa | $289 | $179 | 07/25/2012 | 12/31/2012 |
Three Paratransit Vehicles
|
Napa | $242 | $232 | 04/19/2013 | 07/29/2014 |
Two Replacement Vehicles for American Canyon Transit
|
Napa | $152 | $152 | 04/19/2013 | 07/29/2014 |
VINE CAD/AVL System Part II
|
Napa | $1,529 | $299 | 11/19/2014 | 09/17/2015 |
Vine Transit CAD/AVL System
|
Napa | $2,254 | $711 | 12/31/2014 | 03/31/2016 |
Gold Country - Vehicle Replacement
|
Nevada | $480 | $480 | 07/01/2015 | 05/01/2016 |
Gold Country Stage - Transit Services Facility Improvement
|
Nevada | $522 | $479 | 05/01/2019 | 07/01/2020 |
Gold Country Stage - Vehicle Replacement
|
Nevada | $144 | $144 | 10/01/2013 | 05/01/2014 |
Gold Country Stage - Vehicle Replacement
|
Nevada | $320 | $320 | 07/01/2015 | 05/01/2016 |
Gold Country Stage - Vehicle Replacements
|
Nevada | $636 | $636 | 11/01/2016 | 02/01/2018 |
Gold Country Stage Bus Stop Improvements
|
Nevada | $598 | $573 | 06/01/2020 | 07/01/2020 |
Gold Country Stage Transit Equipment
|
Nevada | $22 | $22 | 01/01/2009 | 08/31/2010 |
Gold Country Stage Vehicle Replacement
|
Nevada | $354 | $354 | 07/01/2008 | 12/31/2009 |
Gold Country Stage Vehicle Replacement (3)
|
Nevada | $480 | $480 | 07/01/2015 | 05/01/2016 |
Gold Country Stage-Transit Transfer Center
|
Nevada | $861 | $363 | 09/01/2011 | 04/30/2013 |
Gold Country Stage-Vehicle Replacement
|
Nevada | $56 | $55 | 01/01/2011 | 12/31/2011 |
Gold County Stage Transit Technology
|
Nevada | $148 | $148 | 01/01/2012 | 10/31/2014 |
Paratransit Vehicle Purchase
|
Nevada | $177 | $177 | 04/01/2013 | 04/01/2013 |
Town of Truckee - Construct Bus Pull Out & Shelter on Estates Drive
|
Nevada | $279 | $60 | 09/01/2020 | 01/31/2021 |
Town of Truckee - Modernization/Technology
|
Nevada | $94 | $94 | 08/30/2016 | 03/20/2020 |
Town of Truckee Transit Vehicle Purchase
|
Nevada | $132 | $129 | 10/23/2008 | 04/30/2009 |
Town of Truckee-Vehicles: Expansion & Replacement
|
Nevada | $538 | $312 | 09/01/2015 | 06/01/2017 |
Transit & Paratransit Retro-fits
|
Nevada | $106 | $106 | 07/08/2008 | 12/31/2008 |
Truckee Intermodal Tarnsportation Center Rehab
|
Nevada | $74 | $74 | 08/18/2011 | 10/31/2011 |
Vehicle Replacement
|
Nevada | $84 | $83 | 09/02/2010 | 12/30/2010 |
ACCESS/Fixed Rte. Radio Sys. Upgrade
|
Orange | $23,376 | $642 | 04/01/2011 | 11/30/2013 |
Anaheim Fueling Infrastructure
|
Orange | $5,742 | $5,198 | 10/01/2007 | 07/31/2012 |
Fullerton Transportation Center (FTC) Elevators
|
Orange | $500 | $500 | 01/18/2017 | 05/02/2019 |
Garden GroveCNG Fueling Infrastructure
|
Orange | $5,807 | $4,359 | 10/31/2007 | 07/31/2012 |
Goldenwest Surface Lot
|
Orange | $2,232 | $1,200 | 12/01/2014 | 09/30/2015 |
Metrolink Rolling Stock Acquisition
|
Orange | $158,009 | $36,300 | 09/01/2008 | 12/31/2011 |
OC Metrolink Service Expansion
|
Orange | $86,468 | $37,226 | 08/31/2009 | 10/01/2012 |
Paratransit/ACCESS Revenue Vehicles
|
Orange | $16,971 | $16,971 | 04/30/2008 | 05/31/2008 |
Placentia Avenue Grade Separation
|
Orange | $73,082 | $17,798 | 07/25/2011 | 11/01/2014 |
Placentia Rail Station
|
Orange | $23,420 | $400 | 02/01/2017 | 09/28/2018 |
Raymond Avenue Grade Separation
|
Orange | $25,921 | $25,172 | 03/31/2014 | 08/31/2018 |
Raymond Avenue Grade Separation (Construction)
|
Orange | $52,507 | $51,382 | 03/31/2014 | 08/31/2018 |
Auburn Transit Bus Shelter
|
Placer | $11 | $11 | 01/01/2011 | 02/18/2011 |
BlueGO Bus Replacement
|
Placer | $1,214 | $327 | 08/31/2014 | 10/31/2015 |
Bus Acquisition
|
Placer | $3,283 | $674 | 06/04/2008 | 06/30/2009 |
Bus Replacement , Cutaway - Auburn
|
Placer | $90 | $23 | 07/01/2010 | 02/28/2011 |
Bus Replacement Acquisition
|
Placer | $1,515 | $1,515 | 12/18/2013 | 05/23/2014 |
Bus Stop/Facility Improvements-Auburn
|
Placer | $40 | $23 | 04/01/2018 | 05/01/2019 |
CNG Bus Replacement
|
Placer | $190 | $43 | 07/01/2008 | 08/01/2009 |
CNG Bus Replacement Project - Auburn
|
Placer | $403 | $221 | 03/01/2015 | 04/01/2015 |
CNG Fueling Station
|
Placer | $306 | $75 | 08/01/2007 | 05/01/2008 |
CTSA Call Center
|
Placer | $313 | $86 | 10/01/2011 | 05/01/2012 |
CTSA Used Vehicle Acquisition Program - Auburn
|
Placer | $4 | $4 | 01/02/2010 | 12/31/2010 |
City of Colfax Transit Center Pedestrian/Bike Access Improvements
|
Placer | $221 | $67 | 07/13/2014 | 08/31/2015 |
City of Colfax Transit Center Public Health & Safety Enhancement
|
Placer | $3 | $3 | 05/23/2018 | 05/25/2018 |
Commuter Bus Expansion-Roseville
|
Placer | $855 | $252 | 06/04/2008 | 07/31/2010 |
Commuter Bus Replacement
|
Placer | $1,584 | $587 | 04/07/2009 | 04/15/2010 |
Corp. Yard Securty Improvements-Roseville
|
Placer | $136 | $38 | 09/25/2013 | 11/25/2013 |
Dial A Ride Bus Replacement
|
Placer | $331 | $323 | 04/15/2008 | 10/15/2008 |
Dial-A-Ride (DAR) & Light Duty Fleet Enhancements
|
Placer | $86 | $86 | 03/01/2011 | 12/01/2012 |
Dial-A-Ride (DAR) Bus Acquisition
|
Placer | $483 | $48 | 09/30/2011 | 04/30/2012 |
Dial-A-Ride and Fixed Route Bus Replacement
|
Placer | $681 | $681 | 08/01/2015 | 12/31/2017 |
Downtown Transfer Point Reconstruction
|
Placer | $333 | $332 | 03/01/2013 | 12/20/2013 |
FY 15 Gillig Bus Purchase
|
Placer | $1,852 | $1,085 | 04/25/2016 | 06/30/2017 |
Freightliner Bus Purchase
|
Placer | $155 | $29 | 04/01/2017 | 06/01/2017 |
Front Street Park-and-Ride Expansion Phase I
|
Placer | $565 | $557 | 10/01/2014 | 11/15/2014 |
Front Street Park-n-Ride Lot Expansion - Phase II
|
Placer | $476 | $470 | 03/30/2016 | 05/15/2018 |
Front Street Park-n-Ride Lot Expansion, Phase 3
|
Placer | $83 | $82 | 12/07/2017 | 06/07/2018 |
ITS Project; Fareboxes, MDTs, & Cameras-Roseville
|
Placer | $133 | $132 | 08/05/2010 | 06/30/2012 |
Lincoln Transit Maintenance Facility
|
Placer | $6,154 | $240 | 04/01/2008 | 05/01/2009 |
Loomis Bus Shelter Project
|
Placer | $50 | $46 | 09/01/2008 | 11/01/2008 |
Loomis Bus Stop Improvements
|
Placer | $23 | $23 | 07/01/2009 | 10/01/2009 |
Loomis Multi-Modal Park & Ride Lot
|
Placer | $431 | $23 | 08/01/2011 | 12/01/2011 |
Loomis Transit Enhancement Project
|
Placer | $101 | $101 | 08/01/2012 | 10/01/2012 |
Loomis Transit Improvements
|
Placer | $81 | $48 | 09/01/2018 | 11/01/2018 |
On-Board Camera System
|
Placer | $28 | $28 | 08/01/2013 | 11/30/2013 |
Placer County Bus Replacement - TART
|
Placer | $534 | $322 | 04/30/2016 | 05/30/2017 |
Placer County Bus Replacements
|
Placer | $3,154 | $1,324 | 07/01/2014 | 04/01/2016 |
Placer County Bus Replacements
|
Placer | $1,162 | $988 | 11/30/2015 | 10/31/2017 |
Placer County Bus Stop Improvements
|
Placer | $211 | $172 | 11/01/2013 | 10/01/2016 |
Placer County Commuter Bus Replacement
|
Placer | $1,386 | $64 | 09/08/2021 | 10/11/2022 |
Radio System Replacement
|
Placer | $5,178 | $245 | 07/05/2017 | 06/30/2018 |
Replacement Parking @ Rocklin Multi-Modal Station
|
Placer | $187 | $180 | 09/30/2008 | 11/30/2008 |
Rocklin Multi-Modal Station Park n ride lot expansion
|
Placer | $446 | $446 | 07/25/2013 | 08/16/2013 |
Rocklin Park & Ride Expansion
|
Placer | $215 | $215 | 04/01/2012 | 11/01/2012 |
Roseville Transit Bus Stop Improvements
|
Placer | $35 | $35 | 12/01/2009 | 02/01/2010 |
Solar Powered Waste Compactor-Roseville
|
Placer | $9 | $9 | 09/01/2010 | 03/31/2011 |
TART Bus Purchase 2018
|
Placer | $543 | $142 | 01/31/2018 | 03/01/2019 |
TART Bus Replacement
|
Placer | $881 | $881 | 07/01/2014 | 01/01/2016 |
TART Operations Center Computer Server
|
Placer | $23 | $22 | 05/01/2009 | 06/30/2009 |
Tahoe City Transit Center
|
Placer | $7,446 | $385 | 06/01/2010 | 10/01/2012 |
Town of Loomis Community Transit Enhancement Multi-modal Transit Station EV Charge Station
|
Placer | $13 | $13 | 03/01/2016 | 05/09/2016 |
Transit Bus Replacement
|
Placer | $526 | $123 | 07/01/2014 | 09/01/2015 |
Transit Bus Replacement - CNG
|
Placer | $1,014 | $250 | 07/01/2014 | 01/01/2016 |
Transit Maintenance/Bus Cover Facility - Lincoln
|
Placer | $727 | $159 | 02/01/2010 | 11/01/2010 |
Transit Revenue Collection Modernization
|
Placer | $391 | $373 | 06/03/2010 | 02/28/2011 |
Universal Fare Technology Program
|
Placer | $389 | $288 | 03/01/2011 | 12/30/2011 |
Vehicle Equipment Modernization
|
Placer | $113 | $85 | 08/01/2015 | 10/15/2018 |
Vehicle Tracking system Upgrade
|
Placer | $172 | $169 | 05/15/2016 | 03/31/2017 |
Western Placer CTSA Community Transit Enhancements
|
Placer | $78 | $57 | 03/07/2012 | 01/01/2014 |
Western Placer CTSA Community Transit Enhancements
|
Placer | $210 | $209 | 03/26/2014 | 06/30/2014 |
Bus Acquisition #3
|
Plumas | $1,134 | $374 | 04/01/2015 | 09/30/2021 |
Plumas Co. Bus Purchase
|
Plumas | $123 | $123 | 08/25/2008 | 03/10/2009 |
Plumas County Bus Yard
|
Plumas | $547 | $411 | 04/07/2016 | 06/30/2023 |
Plumas County Bus-Purchase Replacement Bus
|
Plumas | $129 | $128 | 11/19/2012 | 08/16/2013 |
35' Coach Replacement
|
Riverside | $888 | $882 | 03/04/2016 | 09/12/2016 |
CNG Bus Replacement
|
Riverside | $458 | $458 | 07/25/2012 | 06/30/2013 |
CNG Bus Replacement
|
Riverside | $123 | $123 | 11/01/2011 | 10/01/2012 |
CNG Slow-fill Hose
|
Riverside | $112 | $11 | 08/30/2019 | 09/30/2019 |
CNG Station Repairs & Design
|
Riverside | $76 | $70 | 07/01/2018 | 01/31/2019 |
Coachella Valley Passenger Rail Project
|
Riverside | $1,923 | $1,923 | 11/01/2015 | 02/01/2017 |
Commuter Route 120 Expansion IT Equipment
|
Riverside | $6 | $5 | 07/12/2017 | 12/31/2017 |
Construction of Administrative Building
|
Riverside | $16,165 | $13,694 | 10/03/2011 | 05/31/2022 |
FY 15 New Bus Replacement Project
|
Riverside | $249 | $249 | 08/01/2015 | 02/16/2016 |
FY 15/16 Operations Facility Improvements
|
Riverside | $6 | $6 | 12/01/2016 | 04/30/2017 |
Facility Improvements
|
Riverside | $118 | $118 | 04/17/2020 | 05/31/2021 |
Facility Safety Modernization
|
Riverside | $1,428 | $20 | 05/01/2010 | 12/31/2011 |
Fleet Bay Expansion
|
Riverside | $1,328 | $496 | 08/01/2014 | 12/31/2014 |
Green Metrolink Station Rehab Plan
|
Riverside | $2,538 | $2,538 | 07/01/2008 | 03/31/2011 |
Hydraulic Lift Repair
|
Riverside | $3 | $3 | 10/01/2019 | 10/22/2019 |
La Sierra Station Parking Lot Expansion
|
Riverside | $68 | $68 | 11/30/2011 | 11/30/2011 |
Operation Facility Modernization & Expansion
|
Riverside | $371 | $366 | 05/08/2015 | 01/21/2016 |
Passenger Amenities
|
Riverside | $149 | $148 | 01/15/2013 | 02/15/2013 |
Passenger Rail Efficiency Upgrades
|
Riverside | $3,735 | $3,666 | 10/01/2015 | 06/30/2020 |
Perris Multimodal Facility
|
Riverside | $8,227 | $1,728 | 01/01/2009 | 06/30/2014 |
Perris Valley Line CCTV and Operations Control Center (OCC)
|
Riverside | $1,982 | $1,423 | 01/01/2009 | 06/30/2014 |
Procurement for Rolling Stock (Expansion)
|
Riverside | $5,628 | $5,628 | 10/30/2008 | 12/31/2012 |
Procurement for Rolling Stock (Replacement)
|
Riverside | $57,427 | $32,510 | 09/01/2012 | 05/01/2015 |
Procurement of AVL Equipment
|
Riverside | $2,167 | $221 | 11/01/2009 | 11/01/2011 |
Procurement of Expansion Buses
|
Riverside | $748 | $748 | 12/11/2009 | 07/31/2012 |
Procurement of Replacement Buses
|
Riverside | $6,550 | $3,800 | 01/31/2008 | 02/28/2009 |
Procurment of Rolling Stock
|
Riverside | $1,008 | $523 | 12/01/2011 | 06/01/2012 |
Purchase 8 CNG Mini-Buses
|
Riverside | $526 | $13 | 04/26/2019 | 05/01/2020 |
Purchase Replacement Bus
|
Riverside | $77 | $12 | 03/26/2010 | 05/06/2010 |
Purchase Rolling Stock
|
Riverside | $1,431 | $523 | 10/15/2016 | 12/01/2016 |
Purchase and Install Fareboxes
|
Riverside | $800 | $800 | 09/13/2010 | 06/30/2011 |
Purchase and Install Onboard Security Cameras
|
Riverside | $82 | $82 | 01/01/2010 | 01/01/2012 |
Purchase of CNG Mini-Buses
|
Riverside | $921 | $641 | 11/01/2016 | 05/01/2017 |
Purchase of 70 Replacement CNG 40ft Buses
|
Riverside | $13,576 | $12,303 | 08/01/2021 | 05/01/2023 |
Purchase of Rolling Stock
|
Riverside | $3,285 | $1,188 | 05/01/2015 | 02/01/2016 |
RCTC Station Upgrades & Enhancements
|
Riverside | $3,155 | $2,277 | 12/01/2020 | 04/30/2023 |
Rail Rolling Stock Purchase
|
Riverside | $7,447 | $1,566 | 01/01/2006 | 06/14/2011 |
Renovation of Dispatch & Administration Offices
|
Riverside | $585 | $563 | 05/08/2015 | 01/21/2016 |
Repainting of Mini-Buses
|
Riverside | $140 | $140 | 09/01/2020 | 12/13/2021 |
Replacement Bus Fleet
|
Riverside | $5,180 | $4,931 | 01/01/2017 | 12/31/2018 |
Replacement Dial-A-Ride Vehicle
|
Riverside | $60 | $59 | 08/21/2013 | 02/24/2014 |
Rolling Stock Procurement & Security Cameras
|
Riverside | $249 | $248 | 02/01/2016 | 03/22/2016 |
Rolling Stock Procurement and Security Cameras
|
Riverside | $461 | $459 | 11/05/2014 | 12/31/2015 |
South Perris Parking Lot
|
Riverside | $1,845 | $362 | 04/15/2023 | 06/30/2023 |
Station Upgrade Project
|
Riverside | $2,514 | $2,455 | 01/01/2015 | 06/30/2017 |
Transit Facility
|
Riverside | $801 | $474 | 03/01/2014 | 12/08/2014 |
Vehicle Replacement
|
Riverside | $1,026 | $990 | 06/01/2009 | 08/05/2010 |
Vehicle Replacement (4)
|
Riverside | $473 | $473 | 11/14/2013 | 09/01/2014 |
Vehicle Replacement (FY11)
|
Riverside | $554 | $554 | 02/15/2014 | 11/01/2014 |
29th Street Light Rail Station Enhancements
|
Sacramento | $281 | $32 | 02/01/2017 | 07/31/2018 |
ADA Transit Plan Improvements
|
Sacramento | $695 | $207 | 10/01/2008 | 05/15/2018 |
Ahern-12th Street Improvements
|
Sacramento | $174 | $54 | 10/01/2008 | 04/01/2011 |
Bucket Truck & Aerial Platform Line Truck
|
Sacramento | $433 | $91 | 08/22/2012 | 04/30/2014 |
Bus Replacement - 1 - 40 ft. New Flyer Bus
|
Sacramento | $519 | $163 | 01/01/2011 | 07/01/2011 |
CNG (40') Bus Replacement
|
Sacramento | $56,804 | $14,263 | 12/20/2013 | 09/28/2016 |
Capital Service Enhancements - Mtc. Equipment
|
Sacramento | $123 | $118 | 05/15/2008 | 10/01/2008 |
Capital Service-Construct CNG Station
|
Sacramento | $285 | $275 | 06/01/2008 | 06/30/2009 |
City of Elk Grove Rolling Stock Replace 3 buses
|
Sacramento | $1,593 | $1,593 | 07/01/2013 | 08/09/2013 |
City of Elk Grove Surveillance Cameras
|
Sacramento | $275 | $275 | 08/26/2015 | 01/31/2016 |
City of Folsom Low-Floor Bus Replacement - Revised from City of Folsom Cutaway Bus Replacement
|
Sacramento | $889 | $460 | 03/20/2014 | 12/12/2014 |
City of Folsom Maintenance Equipment
|
Sacramento | $112 | $112 | 04/30/2014 | 12/31/2020 |
City of Folsom Surveillance Equipment
|
Sacramento | $38 | $38 | 03/20/2014 | 12/12/2014 |
Davis Community Transit Vehicle Replacement
|
Sacramento | $228 | $123 | 01/01/2017 | 07/01/2019 |
Downtown/Riverfront Transit Streetcar Development
|
Sacramento | $6,085 | $1,570 | 01/01/2016 | 12/31/2017 |
E&H Ramp Replacement on LRT
|
Sacramento | $1,324 | $1,320 | 11/30/2014 | 10/31/2015 |
Elk Grove Automated Farebox Upgrade
|
Sacramento | $876 | $874 | 12/16/2011 | 12/31/2014 |
Elk Grove Fixed Bus Replacement
|
Sacramento | $1,741 | $1,741 | 08/26/2015 | 12/31/2015 |
Elk Grove Rolling Stock Rehabilitation of GRTA Buses
|
Sacramento | $706 | $703 | 04/01/2012 | 06/30/2013 |
Fixed Route Bus Replacement
|
Sacramento | $4,705 | $2,600 | 12/09/2014 | 06/03/2015 |
Fulton Avenue Bus Shelter Upgrade/Repair
|
Sacramento | $281 | $41 | 07/01/2017 | 12/31/2022 |
Improvements - Bus rehab - 1 Rebuilt Engine
|
Sacramento | $78 | $75 | 10/01/2007 | 10/01/2008 |
Improvements - Bus rehab - 1 Rebuilt Engine
|
Sacramento | $66 | $65 | 10/01/2008 | 10/01/2008 |
Improvements - Bus rehabilitation/5 new wheelchair Lifts
|
Sacramento | $32 | $30 | 10/01/2007 | 10/01/2008 |
Light Rail Crossing Enhancement Program
|
Sacramento | $1,304 | $764 | 07/01/2008 | 06/30/2023 |
Moderization/Destinatin Signs
|
Sacramento | $66 | $63 | 05/15/2008 | 06/30/2009 |
Neighborhood Ride Bus Replacement
|
Sacramento | $1,712 | $117 | 10/22/2014 | 10/31/2015 |
Non Revenue Vehicle Replacement
|
Sacramento | $4,704 | $4,704 | 01/01/2012 | 11/01/2021 |
North Natomas Bus Purchase
|
Sacramento | $1,086 | $400 | 12/15/2011 | 12/31/2012 |
Paratransit On-Board Digital Surveillance System
|
Sacramento | $545 | $545 | 02/16/2013 | 06/30/2016 |
RT Paratransit Vehicle Replacement
|
Sacramento | $7,228 | $7,228 | 05/01/2018 | 06/01/2020 |
Refurbish UTDC Vehicles
|
Sacramento | $25,570 | $16,377 | 02/01/2011 | 06/30/2020 |
Replace Neighborhood Ride Vehicles
|
Sacramento | $1,999 | $1,578 | 07/01/2008 | 12/31/2013 |
Retrofit Light Rail Vehicle (LRV) Hoist
|
Sacramento | $4 | $4 | 02/21/2013 | 09/30/2016 |
Rolling StockCommuter Bus Fleet Replacement
|
Sacramento | $1,725 | $378 | 03/01/2008 | 06/30/2009 |
SRTD CNG Fueling Facility
|
Sacramento | $7,034 | $3,979 | 08/01/2015 | 11/30/2020 |
SRTD Mobile Access Router
|
Sacramento | $799 | $799 | 05/01/2013 | 01/31/2015 |
SRTD So. Line Phase II - Long Lead Time Equipment and Materials
|
Sacramento | $9,000 | $9,000 | 10/01/2012 | 06/30/2023 |
SRTD South Line Phase II - CRC Parking Facility
|
Sacramento | $35,630 | $15,724 | 11/01/2011 | 05/01/2015 |
SacRT Connect Card Firewall & WiFi Replacements & Improvements
|
Sacramento | $751 | $751 | 12/24/2022 | 05/23/2023 |
Seat & Wheelchair Tie-down System Upgrade
|
Sacramento | $491 | $491 | 03/31/2015 | 03/31/2016 |
Security Camera & Scanner
|
Sacramento | $34 | $34 | 12/31/2010 | 04/30/2011 |
Siemens LRV Mid-Life Overhaul
|
Sacramento | $9,217 | $983 | 09/01/2004 | 12/31/2020 |
South Line Phase 2 Light Rail Expansion-Sacramento
|
Sacramento | $17,320 | $4,201 | 09/01/2010 | 05/31/2023 |
South Sacramento Corridor Phase 2 Light Rail Extension
|
Sacramento | $20,072 | $6,734 | 01/01/2012 | 04/01/2014 |
Two Fixed Route Low-Floor Buses
|
Sacramento | $927 | $925 | 12/16/2014 | 11/19/2015 |
Unitrans electric Charging Infrastructure & Maintenance Facility Improvements
|
Sacramento | $3,202 | $1,451 | 06/01/2020 | 06/30/2022 |
Universal Fare Card Implementation
|
Sacramento | $16,936 | $7,378 | 04/01/2012 | 01/01/2014 |
Yuba-Sutter Transit 6 Demand Response Buses
|
Sacramento | $560 | $560 | 07/01/2011 | 11/30/2011 |
"Bus Stop Signage,brochures, tokens & token holders"
|
San Benito | $44 | $43 | 01/01/2010 | 06/01/2016 |
Bus Stop Capital Improvements
|
San Benito | $2 | $2 | 09/01/2022 | 12/01/2023 |
Bus Stop Improvement Plan Upgrades
|
San Benito | $32 | $32 | 07/01/2022 | 12/01/2023 |
Cancelled - Real Time Passenger Notification on Fixed Route & Intercounty Services
|
San Benito | $0 | $0 | 08/01/2019 | 10/01/2019 |
County Express Bus Stop Shelter Program
|
San Benito | $27 | $2 | 07/01/2012 | 10/01/2013 |
County Express Commuter Vehicle
|
San Benito | $248 | $248 | 08/01/2008 | 11/30/2008 |
Customer Service Enhancements
|
San Benito | $23 | $23 | 12/01/2012 | 06/01/2014 |
Express Replacement Vehicles
|
San Benito | $176 | $174 | 03/01/2008 | 08/30/2008 |
Fleet Modernization & Rehabilitation Program
|
San Benito | $618 | $618 | 02/01/2016 | 11/01/2018 |
Technology Expansion
|
San Benito | $290 | $274 | 08/01/2020 | 12/30/2023 |
Three-Year Vehicle Purchase Project
|
San Benito | $560 | $560 | 07/01/2018 | 06/01/2023 |
Transit Maintenance and Operations Improvements
|
San Benito | $842 | $730 | 11/01/2019 | 12/01/2023 |
Upgrade Transit Fueling Infrastructure
|
San Benito | $87 | $87 | 02/01/2013 | 02/01/2013 |
Yard Capital Improvements
|
San Benito | $0 | $0 | 12/01/2019 | 12/01/2022 |
(1) Class E Replacement Vehicle
|
San Bernardino | $147 | $147 | 01/24/2013 | 11/15/2015 |
14/15 Replacement Vehicles
|
San Bernardino | $481 | $473 | 11/01/2015 | 04/01/2016 |
Barstow Bus Stop Amenities
|
San Bernardino | $14 | $9 | 12/31/2014 | 03/31/2015 |
Bus Procurement
|
San Bernardino | $80 | $80 | 08/01/2011 | 12/01/2011 |
Bus Shelters & Lighting
|
San Bernardino | $28 | $28 | 08/01/2015 | 08/30/2015 |
Bus Shelters, Amenities, and Solar Lighting
|
San Bernardino | $252 | $115 | 03/15/2015 | 04/30/2015 |
Bus Shelters, Amenities, and Solar Lighting FY 15
|
San Bernardino | $161 | $125 | 07/15/2016 | 08/31/2016 |
Bus Stop Access Improvements
|
San Bernardino | $46 | $46 | 10/07/2009 | 10/04/2012 |
Bus Stop Access Improvements
|
San Bernardino | $111 | $25 | 10/03/2011 | 10/31/2011 |
Bus Stop Improvements & Amenities (Stops & Zones)
|
San Bernardino | $158 | $158 | 10/01/2021 | 04/01/2022 |
Bus Stop Reconstruction Project
|
San Bernardino | $2,577 | $2,233 | 04/01/2013 | 09/01/2014 |
Bus Turn Out Construction
|
San Bernardino | $402 | $400 | 07/12/2021 | 08/31/2021 |
CNG Station Upgrade
|
San Bernardino | $200 | $200 | 04/19/2012 | 06/30/2013 |
Chaffey College Transit Center
|
San Bernardino | $2,729 | $2,729 | 06/01/2010 | 12/01/2014 |
Commuter Bus Replacement (5)
|
San Bernardino | $3,770 | $269 | 11/18/2013 | 06/30/2014 |
Construct Transfer Hub
|
San Bernardino | $172 | $172 | 09/01/2022 | 05/31/2023 |
County Bus Expansion (2)
|
San Bernardino | $986 | $962 | 11/08/2016 | 12/27/2016 |
Double Tracking Project
|
San Bernardino | $2,229 | $1,548 | 01/01/2015 | 01/01/2016 |
E Street Transit Corridor Project (sbx)
|
San Bernardino | $109,511 | $7,425 | 10/01/2011 | 04/30/2015 |
El Garces Intermodal Transit Center
|
San Bernardino | $200 | $200 | 05/01/2016 | 08/01/2016 |
Energy Management & Storage System
|
San Bernardino | $501 | $500 | 07/23/2018 | 06/28/2019 |
Equip ACCESS Vehicles for Service Readiness
|
San Bernardino | $55 | $31 | 01/01/2013 | 04/30/2014 |
Facility Infrastructure
|
San Bernardino | $2,087 | $2,019 | 08/01/2014 | 06/30/2020 |
Fluid Management System
|
San Bernardino | $350 | $350 | 08/31/2009 | 01/31/2010 |
ITS Hardware/software for buses
|
San Bernardino | $1,399 | $150 | 09/21/2009 | 01/31/2011 |
ITS Updates, Upgrades & Expansion
|
San Bernardino | $587 | $579 | 07/01/2014 | 10/13/2015 |
ITS Updates, Upgrades and Expansion FY17
|
San Bernardino | $282 | $282 | 10/16/2017 | 08/08/2019 |
ITS Updates, Upgrades, and Expansion (15)
|
San Bernardino | $780 | $252 | 05/31/2016 | 09/30/2016 |
Landers Shelter Project
|
San Bernardino | $1 | $0 | 06/30/2015 | 06/30/2015 |
MBTA (2) 30 Passenger Bus Procurement
|
San Bernardino | $299 | $295 | 11/01/2009 | 03/17/2011 |
MBTA Operations Bus Wash Facility
|
San Bernardino | $300 | $300 | 03/01/2009 | 09/30/2009 |
MBTA Vehicle Replacement (13)
|
San Bernardino | $2,405 | $2,253 | 12/19/2018 | 11/18/2022 |
Management Information System
|
San Bernardino | $4,401 | $4,262 | 08/01/2014 | 06/30/2022 |
Metrolink Parking Lot Expansion
|
San Bernardino | $4,081 | $915 | 07/31/2018 | 08/30/2018 |
Metrolink Positive Train Control
|
San Bernardino | $249,292 | $17,276 | 10/15/2010 | 03/31/2023 |
Mid-Life Overhauls (8)
|
San Bernardino | $197 | $40 | 09/18/2017 | 11/20/2017 |
Modernization and Safety Improvements
|
San Bernardino | $164 | $164 | 06/01/2012 | 04/01/2015 |
New Bus Facility
|
San Bernardino | $47,188 | $2,400 | 11/19/2009 | 01/24/2013 |
Paratransit Bus Replacement (2)
|
San Bernardino | $308 | $140 | 08/15/2017 | 08/31/2017 |
Paratransit Bus Replacement (5)
|
San Bernardino | $613 | $115 | 08/15/2017 | 08/31/2017 |
Purchase 2 CNG Fixed Route Vehicles for Barstow Area Transit
|
San Bernardino | $411 | $411 | 09/01/2013 | 12/01/2013 |
Purchase 3 Rail Cars
|
San Bernardino | $5,686 | $5,500 | 09/26/2008 | 10/31/2011 |
Purchase Class H Replacement Buses
|
San Bernardino | $2,097 | $347 | 08/21/2020 | 11/30/2020 |
Purchase Expansion Class E Buses
|
San Bernardino | $285 | $282 | 01/03/2012 | 06/13/2012 |
Purchase Expansion Fixed-Route Transit Coaches
|
San Bernardino | $1,505 | $1,505 | 06/15/2012 | 12/04/2013 |
Purchase Paratransit Buses - Replacement (2) & Expansion (2)
|
San Bernardino | $509 | $114 | 03/31/2015 | 04/15/2015 |
Purchase Regional Replacement Buses (5)
|
San Bernardino | $2,753 | $550 | 08/15/2017 | 08/31/2017 |
Purchase Replacement Buses (3)
|
San Bernardino | $1,177 | $1,177 | 11/01/2013 | 11/30/2013 |
Purchase Replacement Fixed-Route Transit Coach
|
San Bernardino | $568 | $568 | 10/19/2009 | 12/10/2009 |
Purchase Replacement Fixed-Route Transit Coach (NABI)
|
San Bernardino | $1,001 | $143 | 06/15/2012 | 12/04/2012 |
Purchase Replacement Paratransit Buses
|
San Bernardino | $555 | $63 | 04/11/2012 | 12/26/2012 |
Purchase Replacement Paratransit Buses (II)
|
San Bernardino | $192 | $190 | 11/15/2013 | 04/14/2014 |
Purchase Replacement Paratransit Vehicles (4)
|
San Bernardino | $721 | $373 | 10/07/2010 | 11/16/2010 |
Purchase Replacement Paratransit Vehicles (8)
|
San Bernardino | $398 | $398 | 10/15/2010 | 04/15/2011 |
Purchase Replacement Two Class H Vehicles
|
San Bernardino | $1,154 | $215 | 10/06/2020 | 10/16/2020 |
Purchase Replacement Vehicles
|
San Bernardino | $236 | $11 | 08/24/2011 | 03/07/2012 |
Purchase Service Vehicle
|
San Bernardino | $22 | $22 | 11/06/2013 | 11/20/2013 |
Purchase Service Vehicles
|
San Bernardino | $83 | $83 | 11/06/2013 | 11/27/2013 |
Purchase Service Vehicles
|
San Bernardino | $97 | $97 | 02/02/2016 | 04/27/2016 |
Purchase of 2 CNG Cutaway Vehicles
|
San Bernardino | $184 | $183 | 11/01/2009 | 03/17/2011 |
Redlands Passenger Rail Project
|
San Bernardino | $376,794 | $19,694 | 10/01/2016 | 11/30/2021 |
Regional Bus Expansion (2)
|
San Bernardino | $1,172 | $435 | 01/31/2016 | 12/27/2016 |
Regional Bus Replacement (2)
|
San Bernardino | $974 | $970 | 11/15/2013 | 01/14/2014 |
Regional Bus Replacement (2)
|
San Bernardino | $1,101 | $220 | 08/15/2017 | 08/31/2017 |
Regional Bus Replacement BEB (2)
|
San Bernardino | $1,642 | $735 | 07/31/2019 | 09/13/2019 |
Replace Paratransit Vehicles
|
San Bernardino | $1,565 | $1,565 | 01/01/2008 | 06/30/2011 |
Replace Vehicles (5)
|
San Bernardino | $654 | $654 | 11/01/2015 | 05/01/2016 |
Replacement Vehicles
|
San Bernardino | $235 | $235 | 10/10/2008 | 10/10/2008 |
Rolling Stock 40-foot Coach Replacement
|
San Bernardino | $19,373 | $18,934 | 08/01/2014 | 05/01/2023 |
Rueben Campos Transit Center
|
San Bernardino | $303 | $271 | 12/01/2016 | 04/01/2017 |
San Bernardino Downtown Passenger Rail Line Extension
|
San Bernardino | $109,560 | $6,420 | 12/01/2013 | 08/01/2017 |
San Bernardino Transit Center
|
San Bernardino | $3,409 | $3,406 | 12/15/2013 | 10/01/2015 |
Service Vehicles
|
San Bernardino | $825 | $801 | 07/01/2014 | 05/01/2021 |
Shelters, Amenities & Solar Lighting
|
San Bernardino | $176 | $125 | 06/01/2013 | 07/03/2014 |
Shelters, Amenities, and Solar Light FY 16
|
San Bernardino | $147 | $100 | 09/30/2017 | 11/15/2017 |
Shelters, Amenities, and Solar Lighting
|
San Bernardino | $171 | $145 | 03/31/2014 | 04/30/2014 |
Shelters, Amenities, and Solar light FY17
|
San Bernardino | $189 | $125 | 01/30/2019 | 09/05/2020 |
Transit Enhancements
|
San Bernardino | $1,287 | $1,280 | 10/01/2020 | 04/01/2021 |
Twentynine Palms City Yard Security
|
San Bernardino | $27 | $27 | 02/25/2016 | 02/26/2016 |
Vehicle Procurement
|
San Bernardino | $765 | $764 | 04/24/2020 | 12/27/2022 |
38 CNG Bus Replacements
|
San Diego | $15,654 | $15,654 | 06/30/2010 | 09/30/2010 |
Blue Line Light Rail Vehicle Purchase
|
San Diego | $133,383 | $41,397 | 10/09/2009 | 06/03/2013 |
Bus Procurement
|
San Diego | $318 | $0 | 03/31/2009 | 07/31/2009 |
Bus Replacements
|
San Diego | $18,640 | $18,640 | 01/17/2008 | 08/01/2008 |
Bus Replacements
|
San Diego | $9,019 | $9,019 | 04/10/2008 | 11/01/2008 |
Citywide Bus Bench Installations
|
San Diego | $130 | $129 | 03/19/2012 | 07/18/2012 |
Light Rail Vehicle Purchase
|
San Diego | $287,586 | $122,730 | 10/05/2009 | 09/30/2013 |
Positive Train Control
|
San Diego | $85,928 | $1,445 | 08/05/2011 | 07/31/2018 |
SPRINTER
|
San Diego | $477,628 | $8,603 | 11/01/2002 | 04/01/2008 |
31 Balboa:Transit Priority Project & Pedestrian Accessibility Improvements
|
San Francisco | $820 | $0 | 12/13/2019 | 03/31/2021 |
71 Haight-Noriega: Haight St Fast Track Transit & Streeetscape Enhancements
|
San Francisco | $3,906 | $1,451 | 05/01/2017 | 07/09/2022 |
8X Mobility Maximization
|
San Francisco | $5,186 | $1,149 | 05/01/2015 | 06/30/2023 |
ATCS System Management Center Upgrade
|
San Francisco | $26,876 | $3,345 | 05/20/2011 | 11/01/2022 |
Advanced Communications & Information System
|
San Francisco | $25,275 | $2,721 | 12/31/2010 | 12/31/2013 |
BART eBART Project
|
San Francisco | $388,102 | $50,920 | 01/01/2011 | 08/31/2020 |
BART Balboa Park Station Improvements
|
San Francisco | $5,289 | $1,154 | 09/01/2015 | 09/30/2019 |
BART Seismic Retrofit Segment Improvements
|
San Francisco | $545,801 | $11,199 | 08/31/2008 | 03/31/2012 |
BART Station Wayfinding, Lighting, Hardscape & Cleanliness Improvements
|
San Francisco | $46,227 | $4,402 | 09/01/2015 | 12/31/2022 |
BART Train Control Switch Machine Replacement
|
San Francisco | $66,012 | $15,150 | 03/29/2012 | 09/30/2019 |
Balboa Park Station Area and Plaza Improvements
|
San Francisco | $9,494 | $1,460 | 02/01/2016 | 04/30/2017 |
Balboa Park Station Improvements Eastside Connections
|
San Francisco | $1,819 | $779 | 12/01/2013 | 12/15/2017 |
Bus Rehabilitation
|
San Francisco | $223 | $223 | 11/19/2012 | 07/01/2014 |
Capital Program Controls System (CPCS)
|
San Francisco | $5,788 | $0 | 03/07/2011 | 03/31/2016 |
Central Control Interim Facility
|
San Francisco | $1,700 | $1,700 | 03/30/2013 | 06/30/2017 |
Clipper Equipment Replacement
|
San Francisco | $962 | $280 | 01/23/2017 | 06/01/2018 |
Elevator Safety & Reliability Upgrades
|
San Francisco | $2,537 | $1,717 | 10/09/2017 | 02/28/2024 |
Ferry Terminal Public Restroom Facilities Rehabilitation
|
San Francisco | $1,102 | $850 | 01/31/2010 | 09/30/2011 |
Folsom St. Transit Boarding Islands
|
San Francisco | $100 | $100 | 05/30/2019 | 10/31/2019 |
GGBHTD Asset Management and Vehicle Fluid Management Systems
|
San Francisco | $4,601 | $1,814 | 01/31/2009 | 12/31/2009 |
Green Light Rail Center Track Replacement
|
San Francisco | $30,359 | $0 | 01/13/2013 | 04/30/2017 |
High Speed Connectivity and Communications Upgrade
|
San Francisco | $87,769 | $2,500 | 02/01/2013 | 06/30/2019 |
Hunter's View Transit Accessibility Improvement Project
|
San Francisco | $497 | $497 | 09/01/2012 | 08/30/2013 |
LRV Propolusion System Campaign
|
San Francisco | $4,490 | $0 | 10/01/2015 | 12/31/2016 |
Light Rail Vehicle (LRV) Restoration Program
|
San Francisco | $23,441 | $4,601 | 01/01/2011 | 04/30/2017 |
Mission Bay Loop
|
San Francisco | $13,863 | $3,747 | 12/01/2014 | 08/30/2022 |
Mission Mobility Maximization/14 Mission Customer First
|
San Francisco | $7,689 | $2,306 | 11/01/2013 | 06/30/2023 |
Motor Coach Component Rehabilitation
|
San Francisco | $20,489 | $2,810 | 11/01/2012 | 07/01/2014 |
Potrero Hill Pedestrian Safety & Transit Stop Improvements
|
San Francisco | $183 | $153 | 03/28/2016 | 11/01/2022 |
Randolph/Farallones/Orizaba/ Transit Access Pedestrian Safety Project
|
San Francisco | $511 | $379 | 10/01/2014 | 03/30/2015 |
Red Painted Lanes
|
San Francisco | $1,110 | $1,110 | 10/01/2018 | 06/01/2022 |
Replacement of Video Surveillance Systems in Revenue Vehicles
|
San Francisco | $21,890 | $1,191 | 08/13/2012 | 03/31/2015 |
SFMTA Automated Passenger Counter Equipment
|
San Francisco | $1,199 | $1,199 | 05/01/2008 | 04/30/2009 |
SFMTA Central Subway
|
San Francisco | $1,539,423 | $314,912 | 01/04/2010 | 01/31/2020 |
SFMTA Farebox Rehabilitation
|
San Francisco | $19,634 | $19,590 | 05/17/2010 | 12/10/2012 |
SFMTA Geneva Yard - Historic Street Car Enclosure Facility
|
San Francisco | $10,246 | $6,092 | 11/17/2008 | 02/08/2012 |
SFMTA Light Rail Vehicle Rehabilitation
|
San Francisco | $69,994 | $8,900 | 10/29/2009 | 06/30/2020 |
SFMTA Metro East Light Rail Vehicle Facility
|
San Francisco | $8,052 | $8,052 | 07/01/2009 | 12/31/2011 |
SFMTA Operator Restrooms
|
San Francisco | $6,694 | $2,351 | 04/01/2014 | 03/31/2017 |
SFMTA Overhead Rehabilitation 5 Fulton / 21 Hayes
|
San Francisco | $20,636 | $2,267 | 05/17/2010 | 12/10/2012 |
SFMTA Persia Triangle Improvements
|
San Francisco | $1,299 | $659 | 01/01/2015 | 12/31/2015 |
SFMTA Third Street Light Rail
|
San Francisco | $553,386 | $1,433 | 06/01/2008 | 12/31/2016 |
SFMTA Wayside Fare Collection Equipment
|
San Francisco | $22,680 | $1,000 | 11/01/2009 | 08/31/2010 |
San Francisco Paratransit Vehicle Mobile Data Computer (MDC) Project
|
San Francisco | $871 | $0 | 01/01/2012 | 09/01/2012 |
Scaffolding Systems to Repair Hybrid & Trolley Buses
|
San Francisco | $773 | $773 | 04/01/2013 | 07/31/2013 |
Subway CCTV Surveillance System Project
|
San Francisco | $10,674 | $3,051 | 04/02/2013 | 12/31/2015 |
West Portal/St. Francis Circle Project
|
San Francisco | $913 | $913 | 02/01/2016 | 07/05/2017 |
Woods Division Lifts Replacement
|
San Francisco | $6,256 | $10 | 01/01/2013 | 06/30/2014 |
(Bus & Bus Facilities) Software Purchase
|
San Joaquin | $687 | $680 | 06/01/2013 | 06/30/2019 |
ACE Electronic Fare Collection Project
|
San Joaquin | $124 | $31 | 10/31/2018 | 04/01/2019 |
ACE Safety & Security Modernization
|
San Joaquin | $1,425 | $218 | 06/01/2018 | 10/01/2020 |
Ace Maintenance & Layover Facility
|
San Joaquin | $79,241 | $4,300 | 06/30/2011 | 03/31/2014 |
Altamont Rail Corridor (Positive Train Control)
|
San Joaquin | $10,184 | $2,470 | 09/30/2017 | 12/31/2018 |
Bus & Bus Facilities/Passenger Amenities
|
San Joaquin | $3,021 | $2,984 | 05/01/2012 | 12/01/2016 |
Bus Benches and Signs for the City of Escalon
|
San Joaquin | $26 | $25 | 07/01/2011 | 12/31/2011 |
Bus Facilites and Maintenance Equipment
|
San Joaquin | $1,319 | $91 | 07/31/2011 | 06/30/2013 |
Bus Replacement
|
San Joaquin | $115 | $114 | 04/30/2014 | 04/30/2015 |
Bus Replacement
|
San Joaquin | $3,879 | $405 | 04/01/2014 | 04/01/2015 |
Bus Replacements
|
San Joaquin | $301 | $298 | 08/31/2011 | 12/30/2014 |
Bus Technology & Fare Media Upgrades
|
San Joaquin | $22 | $22 | 09/20/2018 | 06/30/2019 |
Circulation Improvements for Cabral Station
|
San Joaquin | $2,315 | $59 | 05/01/2009 | 08/26/2010 |
City of Escalon's Bus Replacement
|
San Joaquin | $212 | $180 | 01/16/2018 | 09/30/2018 |
City of Manteca Multimodal Station Construction
|
San Joaquin | $8,306 | $1,314 | 06/04/2012 | 05/31/2019 |
City of Tracy's Bus Farebox Upgrade
|
San Joaquin | $211 | $205 | 02/20/2018 | 05/31/2018 |
City of Tracy's Bus Replacement
|
San Joaquin | $649 | $640 | 02/20/2018 | 10/31/2018 |
City of Tracy's Fixed Bus Route Bus Replacement
|
San Joaquin | $1,665 | $1,614 | 02/20/2018 | 07/31/2019 |
Escalon's Bus Replacement
|
San Joaquin | $88 | $68 | 03/01/2015 | 06/30/2015 |
Fresno Track Extension
|
San Joaquin | $7,491 | $2,034 | 03/01/2009 | 12/30/2011 |
Hammer Triangle Transfer Station
|
San Joaquin | $1,547 | $747 | 07/01/2011 | 12/31/2011 |
Lodi's Large Bus Replacement
|
San Joaquin | $664 | $550 | 12/01/2018 | 04/01/2019 |
Maintenance Equipment
|
San Joaquin | $1,279 | $1,266 | 04/13/2012 | 09/01/2018 |
Maintenance Facility
|
San Joaquin | $76,678 | $1,380 | 08/01/2011 | 10/31/2013 |
Manteca Bus Stop Improvements
|
San Joaquin | $4,935 | $75 | 09/04/2012 | 11/29/2012 |
Manteca Fare box Upgrades
|
San Joaquin | $342 | $325 | 07/01/2017 | 05/01/2019 |
Manteca Transit Capital Project
|
San Joaquin | $197 | $193 | 07/01/2021 | 12/01/2022 |
Manteca Transit Center Audio/Visual Upgrades Project
|
San Joaquin | $141 | $141 | 03/01/2021 | 12/31/2021 |
Manteca Transit Passenger Amenties
|
San Joaquin | $534 | $5 | 03/01/2018 | 05/31/2018 |
Metro Express/Airport Way BRT
|
San Joaquin | $7,080 | $786 | 07/31/2010 | 09/30/2010 |
Modular Office Building for Maintenance Facility
|
San Joaquin | $126 | $126 | 07/01/2008 | 02/14/2009 |
Multimodal Station Parking Facility
|
San Joaquin | $586 | $586 | 08/04/2009 | 04/30/2010 |
Next New Bus Equipment
|
San Joaquin | $27 | $26 | 04/01/2012 | 04/30/2014 |
Particulate Filter Systems
|
San Joaquin | $438 | $410 | 06/30/2008 | 10/31/2008 |
Passenger Amenities Enhancement
|
San Joaquin | $61 | $12 | 10/01/2009 | 06/30/2015 |
Passenger Amenities Enhancement
|
San Joaquin | $1,081 | $184 | 06/30/2010 | 06/30/2013 |
Passenger Amenities Enhancements/Expansions
|
San Joaquin | $2 | $1 | 01/01/2013 | 01/01/2014 |
Purchase & Install Local Fareboxes
|
San Joaquin | $61 | $60 | 09/30/2011 | 11/01/2012 |
Purchase Cutaway Bus for the City of Escalon
|
San Joaquin | $69 | $16 | 09/01/2010 | 05/31/2011 |
Purchase Transit Bus for the City of Escalon
|
San Joaquin | $24 | $24 | 07/01/2010 | 09/01/2010 |
Purchase Transit Cutaway Bus
|
San Joaquin | $68 | $67 | 11/03/2008 | 12/01/2009 |
Purchase of Commuter Buses
|
San Joaquin | $494 | $494 | 06/01/2008 | 05/31/2010 |
Purchase of Vans under 20ft
|
San Joaquin | $1,055 | $140 | 10/01/2018 | 04/01/2020 |
RTD Metro Express: Hammer Lane BRT Bus Purchase (6)
|
San Joaquin | $6,169 | $797 | 07/01/2011 | 06/12/2012 |
Regional Operations Facility
|
San Joaquin | $1,460 | $1,460 | 04/01/2011 | 06/30/2013 |
Regional Operations Facility (Parcel II)
|
San Joaquin | $3,325 | $876 | 12/01/2010 | 04/01/2012 |
Regional Transportation Center (Phase 1)
|
San Joaquin | $28,871 | $11,243 | 06/01/2013 | 08/01/2015 |
Replacement Transit Fare Collection Equipment
|
San Joaquin | $217 | $200 | 03/31/2019 | 03/01/2021 |
SJRTD's Bus Rehabilitation
|
San Joaquin | $948 | $948 | 10/01/2018 | 06/30/2019 |
Transit Bus Shelter/Maintenance Facility
|
San Joaquin | $701 | $451 | 08/01/2016 | 06/13/2017 |
Transit Fare Collection System (PHASE I)
|
San Joaquin | $45 | $45 | 12/01/2013 | 12/31/2014 |
Transit Fleet Rehabilitation
|
San Joaquin | $1,071 | $1,030 | 08/31/2008 | 11/30/2011 |
"Rt. 9 Bus Stops, El Camino Real - Various"
|
San Luis Obispo | $106 | $60 | 12/09/2009 | 08/24/2018 |
Atascadero Transit Center
|
San Luis Obispo | $912 | $900 | 09/04/2012 | 12/31/2013 |
Bus Stop Improvements
|
San Luis Obispo | $8 | $8 | 11/01/2017 | 06/22/2018 |
Bus Stop Improvements (Prime Outlets)
|
San Luis Obispo | $35 | $35 | 03/27/2008 | 05/01/2008 |
Cancelled - SLO Multi-Modal Transportation Center
|
San Luis Obispo | $0 | $0 | 01/01/2020 | 02/01/2021 |
Driver and Vehicle Safety Enhancements
|
San Luis Obispo | $28 | $9 | 11/01/2011 | 03/31/2012 |
Grover Beach Station Expansion
|
San Luis Obispo | $3,280 | $785 | 08/01/2018 | 12/01/2019 |
Las Tablas Park&Ride Expansion
|
San Luis Obispo | $227 | $76 | 06/21/2010 | 08/23/2010 |
Paso Robles Bus Replacement Local Match
|
San Luis Obispo | $1,405 | $128 | 01/30/2021 | 01/31/2022 |
Paso Robles Train Station Improvements
|
San Luis Obispo | $123 | $37 | 08/23/2010 | 09/10/2010 |
Purchase Back-up Communications Equipment
|
San Luis Obispo | $2 | $2 | 04/01/2011 | 06/01/2011 |
Purchase New Trolley
|
San Luis Obispo | $161 | $134 | 06/23/2008 | 05/21/2009 |
Purchase Replacement Morro Bay Vehicle
|
San Luis Obispo | $83 | $6 | 03/01/2019 | 03/30/2019 |
Purchase Replacement Transit Vehicle
|
San Luis Obispo | $81 | $13 | 10/01/2015 | 12/30/2015 |
RTA Bus Maintenance Facility Local Match
|
San Luis Obispo | $25,194 | $2,252 | 09/01/2020 | 06/30/2022 |
RTA Property Procurement
|
San Luis Obispo | $1,513 | $1,513 | 05/31/2014 | 07/30/2014 |
RTA Shop Equipment
|
San Luis Obispo | $110 | $84 | 05/01/2009 | 06/30/2009 |
RTA Transit Coach Replacement
|
San Luis Obispo | $328 | $328 | 01/31/2017 | 03/06/2019 |
RTA Transit Coach Replacement
|
San Luis Obispo | $389 | $389 | 01/01/2011 | 09/30/2011 |
RTA Transit Coach Replacement
|
San Luis Obispo | $387 | $375 | 12/01/2007 | 05/01/2008 |
RTA Transit Coach Replacement 2009 Gillig
|
San Luis Obispo | $406 | $406 | 06/20/2012 | 08/31/2013 |
RTA Transit Coach Replacement Local Match
|
San Luis Obispo | $1,580 | $320 | 05/01/2018 | 05/01/2019 |
RTA/SCAT Bus Stop Improvements
|
San Luis Obispo | $20 | $20 | 06/01/2011 | 06/30/2012 |
Ride-On Mobile Data Terminals
|
San Luis Obispo | $183 | $182 | 06/25/2010 | 10/15/2010 |
SLO Train Station Platform Light Improv.
|
San Luis Obispo | $120 | $60 | 11/01/2009 | 12/15/2009 |
SLO Transit Bus Radio System Replacement
|
San Luis Obispo | $210 | $26 | 11/01/2011 | 06/30/2012 |
SLO Transit Bus Replacement
|
San Luis Obispo | $722 | $684 | 04/04/2008 | 12/31/2008 |
SLO Transit Bus Stop Improvements
|
San Luis Obispo | $26 | $26 | 01/01/2012 | 12/31/2013 |
SLORTA Transit Facility Construction
|
San Luis Obispo | $5,141 | $1,041 | 12/05/2007 | 07/31/2009 |
SLORTA Transit Maintenance Facility Purchase
|
San Luis Obispo | $4,703 | $799 | 02/15/2013 | 02/28/2013 |
Solar Powered Bus Shelter and Signage
|
San Luis Obispo | $86 | $62 | 09/21/2017 | 11/29/2017 |
Three Low-Floor Transit Vehicles
|
San Luis Obispo | $641 | $590 | 06/01/2012 | 08/01/2012 |
Transit Bus Replacement
|
San Luis Obispo | $1,650 | $475 | 01/01/2012 | 02/28/2012 |
Transit Coach Replacement
|
San Luis Obispo | $1,776 | $1,343 | 08/31/2014 | 06/30/2015 |
Transit Coach Replacement (2)(FY 10/11)
|
San Luis Obispo | $3,767 | $955 | 10/01/2013 | 10/30/2013 |
Transit Station Restrooms
|
San Luis Obispo | $204 | $159 | 02/01/2010 | 05/01/2010 |
Vehicle Replacement
|
San Luis Obispo | $95 | $95 | 06/17/2012 | 11/30/2012 |
Vehicle Replacement
|
San Luis Obispo | $421 | $420 | 01/01/2012 | 02/28/2012 |
Bus Lift Overhaul
|
San Mateo | $787 | $157 | 07/31/2014 | 06/30/2017 |
Bus Stop Improvements
|
San Mateo | $187 | $156 | 09/30/2017 | 04/30/2019 |
City of Pacifica Senior Services Bus Purchase
|
San Mateo | $80 | $56 | 11/28/2011 | 04/04/2012 |
City of San Bruno Senior Shuttle Bus Purchase
|
San Mateo | $128 | $100 | 08/01/2012 | 10/31/2012 |
Daily City Bus Stop Improvements Bayshore Bl
|
San Mateo | $228 | $169 | 09/01/2012 | 12/31/2012 |
Daly City BART Station Improvements
|
San Mateo | $19,849 | $500 | 03/01/2018 | 04/30/2019 |
East Palo Alto Bus Stop Improvements
|
San Mateo | $87 | $72 | 02/01/2011 | 02/09/2011 |
Grade Crossing Improvement
|
San Mateo | $2,276 | $378 | 11/01/2017 | 01/28/2019 |
PCJPB Gallery Car Bike Rack Installation
|
San Mateo | $177 | $177 | 04/01/2011 | 06/30/2011 |
PCJPB Rolling Stock State of Good Repair
|
San Mateo | $9,000 | $9,000 | 07/01/2013 | 03/31/2020 |
Peninsula Corridor Electrification Project
|
San Mateo | $2,182,673 | $7,900 | 07/01/2016 | 12/31/2023 |
Purchase 10 Electric Buses w/Charging Infrastructure
|
San Mateo | $25,875 | $2,279 | 12/31/2017 | 12/31/2023 |
Repaving the Linda Mar Park & Ride
|
San Mateo | $890 | $242 | 08/01/2018 | 03/31/2019 |
Replacement of 13 Cutaway Buses
|
San Mateo | $1,767 | $191 | 11/30/2019 | 04/30/2020 |
Replacement of 14 Minivans
|
San Mateo | $1,074 | $337 | 05/01/2020 | 09/30/2020 |
Replacement of 14 Para Transit Minivans
|
San Mateo | $778 | $91 | 03/01/2014 | 12/31/2014 |
Replacement of 19 Para transit Cutaway Buses
|
San Mateo | $1,876 | $301 | 03/01/2014 | 11/30/2014 |
Replacement of 1998 Gillig Buses
|
San Mateo | $32,899 | $1,821 | 01/01/2013 | 12/31/2014 |
Replacement of 2003 Gillig Buses
|
San Mateo | $25,269 | $3,622 | 02/01/2016 | 08/31/2017 |
Replacement of Advanced Communications System
|
San Mateo | $12,079 | $1,931 | 06/30/2013 | 06/30/2016 |
Replacement of Articulated Bus Fleet
|
San Mateo | $48,710 | $8,648 | 02/01/2018 | 06/01/2020 |
Replacement of Fare Collection Equipment
|
San Mateo | $7,797 | $826 | 03/10/2010 | 09/01/2015 |
Replacement of Paratransit Cutaway Buses
|
San Mateo | $884 | $101 | 03/31/2012 | 09/30/2012 |
Replacement of Public Address System Equipment
|
San Mateo | $25 | $25 | 03/14/2012 | 03/31/2013 |
Route 17 Bus Procurement
|
San Mateo | $1,131 | $900 | 10/15/2008 | 05/31/2010 |
San Bruno Belle Air Transit Circulation Improvements
|
San Mateo | $206 | $151 | 11/01/2017 | 09/30/2018 |
San Bruno Bus Stop Improvements
|
San Mateo | $170 | $136 | 12/01/2011 | 06/30/2018 |
San Carlos Transit Center
|
San Mateo | $7,229 | $1,988 | 11/01/2015 | 09/30/2018 |
San Mateo County Replacement Buses
|
San Mateo | $53,160 | $8,867 | 10/15/2008 | 05/31/2010 |
Signal Optimization
|
San Mateo | $2,000 | $400 | 10/22/2012 | 04/30/2013 |
Systemwide State of Good Repair
|
San Mateo | $400 | $400 | 07/01/2011 | 12/31/2014 |
Van Purchase for Shelter Network
|
San Mateo | $29 | $28 | 01/01/2009 | 02/01/2009 |
ADA Van Cameras
|
Santa Barbara | $38 | $38 | 07/01/2015 | 07/31/2015 |
Audio Logger
|
Santa Barbara | $43 | $43 | 09/01/2016 | 10/31/2016 |
Breeze Route 100 Bus Purchase
|
Santa Barbara | $505 | $495 | 03/01/2015 | 06/01/2015 |
Buellton North Ave of Flags Transit Stop/Park and Ride Construction
|
Santa Barbara | $0 | $0 | 10/01/2022 | 03/01/2023 |
Bus Replacement
|
Santa Barbara | $7,356 | $5,996 | 09/01/2014 | 03/01/2016 |
Bus Stop Amenities
|
Santa Barbara | $41 | $40 | 04/01/2017 | 04/30/2017 |
Bus Stop Improvements
|
Santa Barbara | $422 | $399 | 04/01/2020 | 05/30/2023 |
Bus Stop Improvements
|
Santa Barbara | $118 | $115 | 09/01/2017 | 10/15/2017 |
Bus Washer
|
Santa Barbara | $565 | $565 | 08/01/2015 | 09/01/2015 |
City of Buellton North Ave of Flags Park & Ride
|
Santa Barbara | $0 | $0 | 05/01/2020 | 08/01/2020 |
City of Buellton Transit Stop Improvements
|
Santa Barbara | $41 | $41 | 03/01/2012 | 07/01/2012 |
City of Guadalupe ADA Van Purchase
|
Santa Barbara | $38 | $38 | 02/01/2008 | 04/30/2008 |
City of Guadalupe Replacement Bus
|
Santa Barbara | $179 | $179 | 10/01/2015 | 11/01/2015 |
Clean Air Express Bus & Farebox Cal-ITP
|
Santa Barbara | $542 | $509 | 04/01/2021 | 06/01/2022 |
Clean Air Express Bus Replacement
|
Santa Barbara | $720 | $300 | 05/01/2018 | 09/01/2018 |
Dial-A-Ride Vehicle Replacement
|
Santa Barbara | $48 | $47 | 06/15/2010 | 06/21/2010 |
Dial-A-Ride/CTSA Services
|
Santa Barbara | $50 | $50 | 06/21/2016 | 09/15/2016 |
Dial-A-Ride/CTSA Services
|
Santa Barbara | $51 | $51 | 01/02/2015 | 01/15/2015 |
Dial-A-Ride/CTSA Services for Easy Lift
|
Santa Barbara | $52 | $50 | 01/15/2018 | 01/31/2018 |
Easy Lift DAR Vehicle Purchase
|
Santa Barbara | $46 | $46 | 10/24/2011 | 11/11/2011 |
Easy Lift Dial-a-Ride/CTSA Services
|
Santa Barbara | $88 | $83 | 03/05/2008 | 05/05/2008 |
Easy Lift Vehicle Purchase (5)
|
Santa Barbara | $225 | $208 | 07/01/2012 | 04/22/2013 |
Electric Radiator Fan Conversion (8 Buses)
|
Santa Barbara | $101 | $97 | 01/01/2016 | 02/15/2017 |
Electronic Pass Printer & Encoder
|
Santa Barbara | $22 | $22 | 06/01/2014 | 10/30/2014 |
Emergency Generator
|
Santa Barbara | $80 | $63 | 02/15/2019 | 10/30/2019 |
Fare Media Safe
|
Santa Barbara | $3 | $3 | 07/01/2014 | 08/01/2014 |
IT Enhancements for Transit Facilities
|
Santa Barbara | $21 | $17 | 09/01/2016 | 10/31/2017 |
Intermodal Transit Center
|
Santa Barbara | $9,463 | $1,563 | 01/01/2011 | 04/01/2011 |
Los Alamos Bus Stop Improvements
|
Santa Barbara | $22 | $22 | 02/01/2015 | 11/01/2016 |
Maintenance Computers
|
Santa Barbara | $5 | $5 | 04/01/2016 | 05/01/2016 |
Network Switch for Transit Center
|
Santa Barbara | $5 | $5 | 02/01/2015 | 02/28/2015 |
Operations and Maintenance Center
|
Santa Barbara | $2,209 | $2,167 | 06/30/2021 | 12/31/2022 |
Purchase of AVL System
|
Santa Barbara | $3,692 | $945 | 09/01/2014 | 01/01/2017 |
Radio Upgrade for Core System
|
Santa Barbara | $989 | $952 | 01/02/2020 | 06/20/2023 |
Rehab Garage Floor
|
Santa Barbara | $21 | $21 | 03/01/2015 | 03/31/2015 |
Revenue Collection Equipment/Upgrade
|
Santa Barbara | $13 | $13 | 05/01/2018 | 10/30/2018 |
Round Two Transit Stop Upgrades
|
Santa Barbara | $115 | $115 | 11/01/2014 | 05/01/2015 |
SBMTD Bus Replacement
|
Santa Barbara | $1,487 | $1,121 | 03/31/2016 | 09/30/2017 |
SBMTD Match for Bus Replacement
|
Santa Barbara | $2,941 | $80 | 08/31/2016 | 12/31/2019 |
SBMTD Smartcard System
|
Santa Barbara | $1,710 | $1,000 | 06/01/2016 | 01/31/2017 |
SBMTD Transit Center Rehabilitation
|
Santa Barbara | $4,164 | $1,000 | 09/01/2019 | 06/30/2020 |
SMOOTH Bus Purchase
|
Santa Barbara | $135 | $134 | 07/01/2013 | 01/22/2014 |
SMOOTH Bus Purchase 14/15
|
Santa Barbara | $70 | $19 | 08/01/2016 | 08/01/2016 |
SMOOTH Senior Dial A Ride
|
Santa Barbara | $87 | $53 | 02/01/2008 | 04/30/2008 |
SMOOTH Van Purchase
|
Santa Barbara | $51 | $51 | 11/01/2017 | 12/01/2017 |
SMOOTH Van Purchase
|
Santa Barbara | $40 | $30 | 01/16/2012 | 02/27/2012 |
SMOOTH Van Purchase
|
Santa Barbara | $38 | $30 | 03/29/2011 | 05/06/2011 |
SMOOTH Van Purchase
|
Santa Barbara | $57 | $57 | 11/24/2014 | 02/10/2015 |
SMOOTH Vehicle Replacement
|
Santa Barbara | $280 | $240 | 07/19/2011 | 02/27/2012 |
SYVT - Transit Parking Lot Upgrades
|
Santa Barbara | $151 | $148 | 10/01/2018 | 12/01/2018 |
SYVT - Transit Stop Upgrades
|
Santa Barbara | $222 | $186 | 03/01/2012 | 08/01/2012 |
SYVT Bus Replacement
|
Santa Barbara | $0 | $0 | 10/01/2019 | 12/10/2019 |
SYVT Bus Stop Improvements
|
Santa Barbara | $55 | $55 | 11/01/2014 | 05/01/2015 |
SYVT Rolling Stock
|
Santa Barbara | $365 | $355 | 11/01/2013 | 01/01/2020 |
SYVT Rolling Stock Replacement
|
Santa Barbara | $60 | $60 | 08/13/2013 | 08/13/2013 |
SYVT Security Lighting
|
Santa Barbara | $35 | $35 | 11/01/2014 | 05/01/2015 |
Santa Barbara County Replacement Bus
|
Santa Barbara | $70 | $70 | 01/01/2014 | 01/01/2015 |
Santa Maria Area Transit Bus Purchase
|
Santa Barbara | $1,041 | $25 | 08/01/2012 | 03/21/2014 |
Smart Card Reader
|
Santa Barbara | $24 | $23 | 10/01/2015 | 12/01/2015 |
Surveillance & Secuity System at Transit Properties
|
Santa Barbara | $486 | $449 | 03/01/2021 | 06/01/2023 |
Transit Bus Replacement
|
Santa Barbara | $4,471 | $4,167 | 01/01/2010 | 09/30/2011 |
Transit Center
|
Santa Barbara | $1,068 | $800 | 10/01/2017 | 03/31/2018 |
Transit Equipment Purchase
|
Santa Barbara | $29 | $29 | 05/01/2012 | 06/01/2012 |
Transit Facility Updates/Upgrades
|
Santa Barbara | $58 | $57 | 04/01/2015 | 06/01/2015 |
Transit Stop Improvements
|
Santa Barbara | $5 | $5 | 04/01/2014 | 06/01/2014 |
Vehicle Lift for Transit Yard
|
Santa Barbara | $33 | $33 | 07/01/2014 | 07/31/2014 |
Vehicle Staging Area Expansion
|
Santa Barbara | $307 | $278 | 06/01/2010 | 02/28/2019 |
40' Hybrid Bus Purchase
|
Santa Clara | $60,001 | $6,901 | 10/07/2010 | 12/31/2011 |
40' Hybrid Replacement Bus Procurement
|
Santa Clara | $12,801 | $4,007 | 09/30/2013 | 03/02/2016 |
60ft Hybrid Bus Procurement P-0834
|
Santa Clara | $29,919 | $29,919 | 03/01/2017 | 12/30/2018 |
BRT Articulated Bus Procurement
|
Santa Clara | $13,626 | $10,000 | 07/05/2013 | 12/31/2014 |
Bus Farebox Replacement
|
Santa Clara | $9,591 | $9,591 | 06/30/2010 | 06/30/2015 |
CARB Vehicle Compliance
|
Santa Clara | $2,600 | $2,600 | 06/30/2010 | 12/31/2012 |
Caltrain Positive Train Control Systems/CBOSS
|
Santa Clara | $291,700 | $22,454 | 10/01/2013 | 01/01/2024 |
Caltrain Station Improvements
|
Santa Clara | $24,962 | $841 | 01/19/2009 | 08/31/2012 |
Community Bus Procurement
|
Santa Clara | $9,125 | $9,125 | 09/01/2013 | 11/01/2014 |
Cropley Single Crossover
|
Santa Clara | $4,494 | $46 | 06/01/2019 | 07/29/2022 |
Express Bus Procurement
|
Santa Clara | $13,396 | $13,396 | 09/01/2014 | 10/01/2014 |
Guadalupe Traction Power System
|
Santa Clara | $5,004 | $1,150 | 01/03/2013 | 09/01/2016 |
Narrow Banding
|
Santa Clara | $2,343 | $209 | 10/31/2011 | 09/30/2013 |
Non-Revenue Vehicle Procurment
|
Santa Clara | $1,387 | $1,300 | 02/20/2012 | 09/30/2013 |
PCJPB South Terminal Station Project
|
Santa Clara | $34,370 | $20 | 12/03/2009 | 08/31/2012 |
Paratransit Vehicle & Equipment Purchase
|
Santa Clara | $10,030 | $9,967 | 09/26/2012 | 09/29/2017 |
Rail Replacement & Rehabilitation Program
|
Santa Clara | $5,775 | $1,328 | 09/01/2011 | 12/31/2017 |
SCVTA & Caltrain Ticket Vending
|
Santa Clara | $6,251 | $2,420 | 06/01/2008 | 05/31/2015 |
SCVTA Santa Clara / Alum Rock Corridor BRT
|
Santa Clara | $138,451 | $90,008 | 04/01/2014 | 01/31/2018 |
Santa Clara VTA Blossom Hill/Monterey Hwy. Ped O/C
|
Santa Clara | $11,196 | $6,790 | 01/01/2011 | 01/31/2014 |
Traction Power Substation REHABILITATION
|
Santa Clara | $4,024 | $1,031 | 03/25/2010 | 12/31/2012 |
Traction Power Substation REPLACEMENT Program
|
Santa Clara | $6,594 | $1,469 | 09/01/2015 | 06/30/2016 |
VTA/Alum Rock Rapid Transit Bus Purchase
|
Santa Clara | $9,348 | $9,186 | 07/05/2013 | 12/31/2014 |
Bus & Facilities Improvement
|
Santa Cruz | $5,669 | $4,205 | 07/01/2018 | 09/01/2019 |
Cancelled - Pacific Station Renovation
|
Santa Cruz | $0 | $0 | 10/01/2019 | 09/01/2021 |
MetroBase Operations Facility
|
Santa Cruz | $76,931 | $22,131 | 12/01/2009 | 12/01/2019 |
2014/15 Transit Vehicle
|
Shasta | $2,512 | $503 | 12/01/2018 | 01/01/2021 |
ADA Passenger Accessibility & Loading Improvements
|
Shasta | $6,500 | $1,755 | 09/01/2013 | 03/01/2017 |
Bus Parking Canopy with PV Solar Panels
|
Shasta | $941 | $787 | 10/01/2017 | 03/01/2018 |
Expand RABA Downtown Transit Center-Redding
|
Shasta | $2,082 | $2,082 | 11/01/2014 | 08/01/2015 |
Facility Improvements and Equipment
|
Shasta | $594 | $330 | 06/01/2016 | 07/01/2023 |
Maintenance Facility Lobby Renovation
|
Shasta | $58 | $57 | 01/01/2015 | 02/01/2015 |
Maintenance Lift
|
Shasta | $12 | $0 | 01/01/2012 | 02/28/2012 |
Paint Transit Bus
|
Shasta | $30 | $28 | 09/01/2009 | 09/30/2010 |
Paratransit Vehicle Purchase
|
Shasta | $182 | $50 | 01/01/2017 | 03/01/2017 |
Pave Parking Area for RABA Vehicles
|
Shasta | $227 | $224 | 10/01/2010 | 02/01/2011 |
Purchase Dispatch Software
|
Shasta | $227 | $143 | 09/01/2009 | 09/30/2010 |
RABA Maint. Facility Expansion-Redding
|
Shasta | $2,125 | $745 | 06/30/2008 | 04/27/2009 |
Redding Bus Purchase
|
Shasta | $1,522 | $311 | 08/01/2010 | 06/01/2011 |
Replace/Renovate Bus Wash at the Maintenance Facility
|
Shasta | $177 | $177 | 12/01/2018 | 03/01/2019 |
Replace/Renovate HVAC on the Existing Maintenance Facility
|
Shasta | $80 | $77 | 07/01/2016 | 08/01/2016 |
Transit Bus Purchase
|
Shasta | $1,087 | $249 | 08/01/2012 | 08/01/2013 |
Transit Bus Purchase
|
Shasta | $2,082 | $271 | 09/01/2009 | 12/01/2011 |
Transit Bus Purchase
|
Shasta | $2,368 | $496 | 12/01/2015 | 01/01/2016 |
Transit Technology Modernization
|
Shasta | $1,297 | $878 | 07/01/2018 | 12/31/2023 |
Transit Vehicle Purchase
|
Shasta | $53 | $17 | 01/01/2014 | 01/30/2014 |
2015 Purchase of Two Transit Vehicles
|
Sierra | $117 | $17 | 06/28/2016 | 01/20/2017 |
Purchase of Public Transit Minivan
|
Sierra | $43 | $24 | 09/01/2008 | 01/01/2009 |
Replacement of Transit Vehicles
|
Sierra | $101 | $26 | 06/23/2010 | 02/03/2011 |
Transit Vehicles Purchase
|
Sierra | $104 | $104 | 04/01/2014 | 08/18/2014 |
Purchase of Bus
|
Siskiyou | $176 | $176 | 09/17/2010 | 07/14/2011 |
Transit Bus Stop Facilities
|
Siskiyou | $2,950 | $2,104 | 05/01/2015 | 12/01/2015 |
Transit Related Equipment
|
Siskiyou | $48 | $48 | 06/16/2011 | 08/26/2011 |
City of Benicia Replacement Bus
|
Solano | $86 | $22 | 05/01/2008 | 12/01/2008 |
City of Dixon Replacement Vehicles
|
Solano | $160 | $86 | 09/01/2009 | 10/31/2009 |
City of Fairfield - Bus Stop Improvements
|
Solano | $435 | $419 | 09/01/2008 | 03/31/2016 |
City of Fairfield 35-foot Bus Purchase
|
Solano | $757 | $400 | 04/01/2009 | 05/22/2009 |
City of Vallejo - Replace 5 Buses
|
Solano | $3,170 | $304 | 10/27/2009 | 04/30/2011 |
City of Vallejo Bus Fixed / Heavy Equipment
|
Solano | $76 | $15 | 05/01/2011 | 09/30/2012 |
City of Vallejo Bus Maintenance Facility Repair
|
Solano | $10,058 | $4,403 | 03/01/2009 | 08/31/2017 |
City of Vallejo Bus Shelters and Stops
|
Solano | $882 | $761 | 08/01/2009 | 10/31/2015 |
City of Vallejo Ferry Dredging
|
Solano | $853 | $200 | 09/15/2008 | 10/15/2008 |
City of Vallejo Ferry Maintenance Engine Overhaul
|
Solano | $1,286 | $200 | 09/29/2008 | 01/15/2009 |
City of Vallejo Purchase 1 Hybrid Bus
|
Solano | $4,406 | $294 | 11/13/2009 | 05/15/2011 |
City of Vallejo Purchase Vehicle Replacement Parts
|
Solano | $258 | $29 | 03/15/2009 | 09/30/2012 |
City of Vallejo Replace 9 Buses
|
Solano | $5,849 | $589 | 10/27/2009 | 04/30/2011 |
Fairfield DART Paratransit Replacement Vehicles
|
Solano | $144 | $110 | 07/01/2010 | 11/01/2010 |
Fairfield Urban Bus Purchase
|
Solano | $379 | $121 | 04/01/2008 | 05/22/2009 |
Intercity Bus Purchase
|
Solano | $797 | $9 | 05/21/2018 | 04/30/2019 |
Intercity Bus Replacement
|
Solano | $4,746 | $1,534 | 07/01/2015 | 12/31/2016 |
Local Bus Replacement
|
Solano | $4,179 | $849 | 07/01/2012 | 05/01/2013 |
Local Bus Replacement (Local Match)
|
Solano | $165 | $12 | 07/01/2016 | 02/01/2017 |
Narrow Banding Radio System
|
Solano | $17 | $17 | 09/01/2012 | 10/31/2012 |
North Bay Maintenance Facility
|
Solano | $24,894 | $2,623 | 08/01/2013 | 04/30/2016 |
Paratransit Vehicle Purchase
|
Solano | $72 | $68 | 07/01/2010 | 11/01/2010 |
Replace (7) Buses(Now only 3)
|
Solano | $1,563 | $1,450 | 07/01/2015 | 03/31/2017 |
Security Camera Installation on Buses
|
Solano | $168 | $163 | 07/01/2018 | 12/01/2022 |
Suisun City/Fairfield Transportation Flex Shuttle
|
Solano | $64 | $60 | 03/01/2013 | 02/28/2014 |
Vacaville Bus Shelters
|
Solano | $137 | $110 | 01/01/2010 | 02/04/2010 |
Vacaville City Coach - Replace 5 Buses
|
Solano | $4,560 | $240 | 06/01/2008 | 10/01/2009 |
Vacaville Intermodal Station
|
Solano | $77,978 | $1,260 | 03/12/2015 | 08/31/2017 |
40' Clean Diesel Bus Replacement
|
Sonoma | $2,515 | $1,523 | 07/18/2017 | 11/30/2018 |
ADA Improvements & Safety Modifications
|
Sonoma | $34 | $19 | 02/01/2016 | 03/31/2016 |
Bus Rehabilitation
|
Sonoma | $319 | $69 | 07/01/2011 | 12/01/2013 |
Bus Replacement Purchase
|
Sonoma | $949 | $247 | 07/18/2017 | 11/30/2018 |
Bus Stop Enhancements
|
Sonoma | $324 | $200 | 10/01/2013 | 12/31/2017 |
Bus Stop Improvements for the City of Petaluma
|
Sonoma | $96 | $77 | 07/31/2014 | 02/28/2015 |
Bus Wash
|
Sonoma | $138 | $131 | 02/06/2020 | 02/06/2020 |
Enhanced AVL Project
|
Sonoma | $1,548 | $458 | 07/16/2012 | 03/31/2014 |
Hybrid Bus Purchase
|
Sonoma | $4,503 | $575 | 07/01/2010 | 08/31/2011 |
Petaluma Transit Electronic Fareboxes
|
Sonoma | $150 | $30 | 02/01/2015 | 08/31/2015 |
Petaluma Transit Maintenance & Operations Facility Rehabilitation
|
Sonoma | $750 | $150 | 07/01/2012 | 06/01/2014 |
Petaluma Transit-Replace four Paratransit Vans
|
Sonoma | $359 | $93 | 03/03/2014 | 06/01/2017 |
Replacement Bus Purchase
|
Sonoma | $69 | $67 | 10/15/2010 | 12/07/2010 |
Replacement Bus Purchase (5)
|
Sonoma | $363 | $363 | 07/01/2007 | 06/30/2009 |
Replacement Buses
|
Sonoma | $1,355 | $889 | 03/30/2013 | 03/31/2014 |
Santa Rosa - Replacement Three Bus Purchase
|
Sonoma | $138 | $138 | 07/01/2009 | 05/31/2011 |
Santa Rosa City Bus Purchase
|
Sonoma | $2,383 | $901 | 07/30/2008 | 09/01/2009 |
Santa Rosa Hybrid Bus Expansion
|
Sonoma | $1,044 | $502 | 02/01/2008 | 05/31/2008 |
Sonoma County Replacement Bus Purchase
|
Sonoma | $10,446 | $5,017 | 08/01/2016 | 09/30/2016 |
Sonoma County Replacement Bus Purchase
|
Sonoma | $4,883 | $1,053 | 02/01/2009 | 03/31/2010 |
Vehicle Replacement & Transit Improvements
|
Sonoma | $900 | $893 | 10/01/2013 | 12/01/2013 |
1 40 ft. CNG Heavy Duty Transit Bus
|
Stanislaus | $444 | $244 | 04/01/2008 | 06/01/2009 |
2 40 ft. CNG Heavy Duty Transit Buses
|
Stanislaus | $919 | $101 | 04/01/2008 | 06/01/2009 |
3 Paratransit Buses (Now 6 per CAP)
|
Stanislaus | $812 | $812 | 11/01/2014 | 09/30/2015 |
Automated Validating Fareboxes
|
Stanislaus | $88 | $88 | 10/31/2011 | 10/31/2012 |
Build Bus Fare Depository
|
Stanislaus | $40 | $40 | 11/30/2010 | 03/31/2012 |
Bus Facilities Project
|
Stanislaus | $54 | $54 | 11/01/2011 | 07/31/2012 |
Bus LED Designnation Signs & Brochure Holders
|
Stanislaus | $13 | $13 | 10/15/2008 | 03/11/2009 |
Bus Maintenance Facility Security
|
Stanislaus | $119 | $119 | 03/01/2010 | 12/31/2012 |
Bus Stop Improvements
|
Stanislaus | $214 | $150 | 09/01/2017 | 01/11/2018 |
Bus Stop Signage
|
Stanislaus | $199 | $130 | 11/01/2016 | 06/01/2020 |
Bus Window Replacement
|
Stanislaus | $2,472 | $315 | 06/30/2012 | 06/30/2013 |
CNG Bus Purchase for City of Ceres
|
Stanislaus | $142 | $140 | 02/01/2014 | 03/01/2014 |
CNG Slow Fill Compressor
|
Stanislaus | $389 | $350 | 10/25/2013 | 09/01/2014 |
Ceres Bus Shelter & Bus Stop Improvements
|
Stanislaus | $248 | $236 | 06/01/2017 | 08/01/2022 |
Ceres Transit Bus Shelter
|
Stanislaus | $88 | $81 | 12/01/2011 | 11/30/2012 |
Ceres Transit CNG Bus Purchase
|
Stanislaus | $148 | $125 | 10/01/2008 | 04/30/2009 |
Compressed Natural Gas Transit Bus (35ft.)
|
Stanislaus | $507 | $493 | 01/08/2009 | 08/01/2010 |
Electronic Farebox System
|
Stanislaus | $320 | $200 | 12/01/2015 | 04/01/2016 |
Farebox Systems for Ceres Buses
|
Stanislaus | $156 | $155 | 06/01/2014 | 11/01/2014 |
ITS Project/AVL for Buses
|
Stanislaus | $94 | $90 | 06/01/2019 | 08/31/2019 |
New Bus Maintenance Facility in Modesto
|
Stanislaus | $17,734 | $1,238 | 11/01/2010 | 03/31/2012 |
ParaTransit Bus Purchase
|
Stanislaus | $873 | $869 | 12/01/2014 | 03/01/2016 |
Patterson Intermodal Transfer Facility Project
|
Stanislaus | $312 | $288 | 11/01/2011 | 06/01/2012 |
Procurement of 40ft CNG Transit Buses
|
Stanislaus | $1,811 | $1,800 | 07/01/2015 | 08/30/2015 |
Procurement of Para Transit Vehicles
|
Stanislaus | $783 | $500 | 03/01/2016 | 07/01/2016 |
Purchase & Install TRIM Strip Farebox Units
|
Stanislaus | $817 | $786 | 10/01/2014 | 08/01/2016 |
Purchase & Install AVL in Fixed Route Buses
|
Stanislaus | $967 | $321 | 12/01/2008 | 10/30/2009 |
Purchase & Install Bus Washer
|
Stanislaus | $19,141 | $245 | 11/01/2010 | 03/31/2012 |
Purchase 11 new buses to replace 1983 & 1990
|
Stanislaus | $4,450 | $2,022 | 12/01/2008 | 12/31/2009 |
Purchase 2 CNG buses 1 gas 1 CNG Trolley
|
Stanislaus | $354 | $354 | 07/01/2008 | 11/01/2008 |
Purchase 40' Low-Floor CNG Heavy Duty Buses
|
Stanislaus | $3,630 | $2,390 | 12/01/2012 | 01/31/2013 |
Purchase 6 New Buses
|
Stanislaus | $2,748 | $666 | 01/01/2012 | 03/01/2013 |
Refurbish 1998, 2001, & 2003 Buses
|
Stanislaus | $6,915 | $5,571 | 03/31/2014 | 09/01/2018 |
Refurbish 2003 Buses
|
Stanislaus | $662 | $635 | 01/01/2016 | 01/01/2017 |
Safety & Security Improvements to Existing Facility
|
Stanislaus | $206 | $187 | 04/01/2018 | 05/31/2018 |
Timed Fill Compressed Natural Gas Bus Fueling Sta.
|
Stanislaus | $280 | $273 | 09/09/2009 | 07/20/2010 |
Transit Transfer Center
|
Stanislaus | $5,442 | $1,549 | 07/28/2011 | 12/31/2012 |
Transit Transfer Center PHASE II
|
Stanislaus | $1,130 | $1,100 | 06/22/2017 | 12/01/2019 |
Upgrade AVL to Improve Real Time
|
Stanislaus | $1,558 | $1,500 | 10/01/2014 | 12/01/2014 |
Upgrade Bus Stops
|
Stanislaus | $238 | $230 | 07/01/2011 | 12/31/2019 |
Video Surveillance Camera System
|
Stanislaus | $15 | $15 | 09/01/2012 | 10/01/2012 |
Bus Stop Improvements
|
Tehama | $146 | $76 | 05/09/2015 | 10/27/2015 |
Purchase Replacement Transit Buses
|
Tehama | $737 | $667 | 06/01/2016 | 01/01/2020 |
Purchase and remodel transit facility
|
Tehama | $1,873 | $1,546 | 09/30/2019 | 02/20/2020 |
Replace (2) Paratrax Vehicle
|
Tehama | $173 | $170 | 01/01/2014 | 01/05/2014 |
Tehema County Bus Purchase and Rehab
|
Tehama | $508 | $494 | 03/12/2009 | 09/12/2009 |
Bus Replacement/Type VII -21 Passenger-Weaverville
|
Trinity | $117 | $117 | 04/01/2011 | 06/01/2011 |
Heavy Duty Vehicle Lift
|
Trinity | $21 | $21 | 03/01/2020 | 04/01/2020 |
Land Acquisition Transit Facility Development
|
Trinity | $211 | $210 | 09/01/2015 | 09/01/2016 |
Purchase of Safety and Security Equipment for Transit Vehicles
|
Trinity | $9 | $7 | 02/01/2012 | 10/01/2012 |
Radio Equipment Upgrade
|
Trinity | $12 | $12 | 03/01/2019 | 09/01/2019 |
Rolling Stock Bus Procurement
|
Trinity | $166 | $26 | 12/01/2014 | 02/27/2015 |
Transit Facility Design
|
Trinity | $483 | $174 | 05/01/2023 | 06/30/2023 |
Trinity Transit Bus Replacement
|
Trinity | $121 | $121 | 02/01/2012 | 10/01/2012 |
(1) CNG Transit Bus for DART
|
Tulare | $117 | $117 | 01/01/2015 | 09/30/2015 |
15 Bus Shelters w/Solar Lighting for the City of Dinuba
|
Tulare | $99 | $99 | 07/01/2021 | 12/01/2021 |
2 CNG Replacement Buses & 15 Electronic Fareboxes
|
Tulare | $957 | $956 | 04/01/2014 | 08/24/2015 |
9 ADA Compliant Bus Shelters
|
Tulare | $19 | $18 | 09/30/2012 | 06/30/2013 |
Automatic Passenger Counter System
|
Tulare | $330 | $325 | 07/07/2015 | 01/01/2016 |
Bus Cover Shop
|
Tulare | $78 | $76 | 04/01/2008 | 10/31/2008 |
Bus Replacement
|
Tulare | $262 | $262 | 09/30/2008 | 06/30/2009 |
Bus Replacement
|
Tulare | $801 | $460 | 08/01/2009 | 09/01/2009 |
Bus Stop Amenities
|
Tulare | $441 | $440 | 05/02/2013 | 09/15/2015 |
Bus Stop Shelters for Lindsay
|
Tulare | $51 | $50 | 03/01/2012 | 03/31/2012 |
CNG Passenger Vehicle Purchase City of Lindsay transferred to City of Portersville
|
Tulare | $108 | $88 | 10/01/2008 | 10/15/2008 |
CNG Transit Bus Purchase
|
Tulare | $422 | $242 | 07/30/2009 | 09/13/2010 |
CNG Transit Bus for Dinuba
|
Tulare | $135 | $124 | 09/01/2011 | 04/01/2012 |
CNG Transit Buses
|
Tulare | $247 | $157 | 04/01/2008 | 04/30/2008 |
City of Dinuba - Purchase of Electronic Farebox Equipment & Related Components
|
Tulare | $53 | $48 | 07/01/2022 | 03/31/3023 |
City of Dinuba - Transit Center Construction
|
Tulare | $2,078 | $130 | 01/01/2013 | 01/31/2014 |
City of Dinuba - Transit Center Design
|
Tulare | $172 | $172 | 06/01/2012 | 07/31/2013 |
City of Woodlake Transit Center
|
Tulare | $925 | $266 | 03/03/2013 | 09/01/2013 |
Design, R/W Acquis & Const of a Visitor/Shuttle Info Center
|
Tulare | $3,159 | $1,015 | 10/01/2009 | 07/31/2011 |
Facility Expansion, Operations & Maintenance
|
Tulare | $7,240 | $4,411 | 06/01/2010 | 09/30/2011 |
Intelligent Transportation System
|
Tulare | $1,188 | $924 | 03/01/2016 | 04/30/2016 |
Passenger Information System
|
Tulare | $244 | $243 | 06/01/2012 | 10/01/2012 |
Passenger Information System and CNG buses
|
Tulare | $373 | $243 | 08/01/2012 | 07/10/2013 |
Purchase & Install Electronic Fareboxes
|
Tulare | $34 | $26 | 12/31/2018 | 01/10/2019 |
Purchase 2 35ft Battery Electric Buses
|
Tulare | $1,762 | $725 | 08/01/2016 | 03/31/2017 |
Purchase 2 CNG Buses
|
Tulare | $154 | $154 | 10/24/2012 | 07/18/2013 |
Purchase 2 Cutaway Buses & Bus Parts
|
Tulare | $102 | $101 | 02/01/2018 | 08/01/2018 |
Purchase 2 TIME Buses
|
Tulare | $2,473 | $508 | 08/01/2021 | 02/28/2023 |
Purchase 3 CNG Buses
|
Tulare | $462 | $462 | 10/24/2012 | 07/18/2013 |
Purchase ITS Equipment(FY 14/15)
|
Tulare | $273 | $47 | 01/01/2019 | 03/01/2021 |
Purchase New Bus for New Bus Route
|
Tulare | $440 | $82 | 04/22/2010 | 04/22/2010 |
Purchase One 35 foot CNG Bus
|
Tulare | $465 | $465 | 08/01/2012 | 12/01/2013 |
Purchase One CNG Bus
|
Tulare | $162 | $159 | 02/04/2014 | 10/31/2014 |
Purchase Surveillance Cameras
|
Tulare | $44 | $25 | 11/01/2018 | 03/31/2019 |
Purchase Transit System Signage
|
Tulare | $22 | $21 | 07/29/2015 | 09/28/2015 |
Purchase one CNG Transit Bus
|
Tulare | $114 | $114 | 03/21/2014 | 10/31/2014 |
Replacement of 1 CNG Bus
|
Tulare | $478 | $476 | 04/01/2014 | 08/24/2015 |
Rolling Stock Procurement of 7 CNG Vehicles
|
Tulare | $1,135 | $1,135 | 08/01/2008 | 08/17/2009 |
Transit DAR Shelters for Woodlake
|
Tulare | $47 | $47 | 10/01/2011 | 11/30/2011 |
Transit Infrastructure Improvements
|
Tulare | $5,368 | $4,980 | 08/30/2017 | 09/30/2020 |
Web Based Fare System for Electronic Fare Boxes
|
Tulare | $813 | $244 | 09/30/2015 | 12/31/2018 |
Yard Bus Maint. Facility
|
Tulare | $1,259 | $434 | 11/01/2008 | 09/01/2009 |
Bus Stop Improvements
|
Tuolumne | $12,341 | $2,083 | 04/01/2021 | 10/15/2022 |
Bus Stop Improvements
|
Tuolumne | $766 | $737 | 07/01/2016 | 12/31/2016 |
Zero Emissions Bus Purchase
|
Tuolumne | $208 | $0 | 08/05/2021 | 06/30/2022 |
BART MAinline Signal Light Replacement
|
Various | $1,100 | $500 | 12/01/2014 | 06/30/2017 |
BART Mainline Cover Board Antenna
|
Various | $2,035 | $500 | 10/01/2015 | 09/30/2017 |
BART Ticket Vending Machines Upgrades (Clipper Dispensing)
|
Various | $4,572 | $1,174 | 10/01/2015 | 06/30/2017 |
Bicycle Station and Locker Parking
|
Various | $1,030 | $598 | 06/30/2017 | 12/30/2018 |
Purchase 10 Low-Floor, Demand Response Buses
|
Various | $1,400 | $249 | 12/01/2018 | 12/01/2019 |
Solar Shelter Lighting
|
Various | $67 | $33 | 01/01/2016 | 01/19/2016 |
Speed Frater Switch Machine Replacement
|
Various | $8,593 | $1,350 | 03/29/2018 | 11/30/2018 |
TTD - ADA Accessible Minivan
|
Various | $67 | $13 | 04/01/2016 | 10/31/2016 |
TTD-So. Shore Transit AVL System & Schedule Software
|
Various | $91 | $88 | 11/01/2015 | 01/31/2017 |
Van Ness BRT
|
Various | $216,021 | $7,962 | 10/27/2016 | 10/01/2022 |
Wayfinding Signage & Real-Time Display
|
Various | $39,613 | $5,375 | 07/01/2014 | 12/31/2022 |
City of Ojai Transit Trolley Bus Purchase
|
Ventura | $247 | $195 | 05/17/2018 | 09/01/2018 |
Coordinated Paratransit Manag. Sys.
|
Ventura | $2,335 | $1,168 | 09/17/2007 | 09/30/2008 |
East-West Connector VISTA Bus Acquisition
|
Ventura | $1,346 | $137 | 01/01/2017 | 07/01/2017 |
Expansion of Metrolink Parking Lot and Slurry Seal of Existing Lot
|
Ventura | $1,219 | $1,119 | 01/01/2022 | 09/01/2022 |
GCT Replacement Buses
|
Ventura | $6,614 | $3,560 | 05/01/2015 | 12/31/2016 |
Gold Coast Transit - Operator Training Equipment
|
Ventura | $162 | $162 | 04/15/2013 | 07/15/2013 |
Heritage Valley Transit Bus Acquisition
|
Ventura | $1,734 | $1,734 | 11/30/2013 | 04/30/2017 |
Moorpark City Transit Vehicles (2 CNG Buses)
|
Ventura | $864 | $774 | 10/01/2014 | 01/19/2016 |
New Facility Plan, Design, Land Purchase, and Construction
|
Ventura | $10,915 | $10,868 | 04/01/2017 | 06/30/2019 |
Purchase Replacement Transit Buses
|
Ventura | $3,866 | $420 | 07/11/2008 | 07/31/2009 |
Purchase Two ROTEM Rail Cars
|
Ventura | $33,697 | $1,976 | 11/20/2011 | 06/15/2013 |
Replacement DAR Vehicles
|
Ventura | $803 | $800 | 04/30/2014 | 10/30/2014 |
Replacement Paratransit Vehicles & Scheduling Software
|
Ventura | $2,601 | $2,597 | 02/15/2015 | 12/31/2021 |
SVT Purchase of Three Replacement Paratransit Vans
|
Ventura | $614 | $433 | 06/20/2015 | 11/01/2015 |
Safety Improvement in Ventura County
|
Ventura | $226 | $37 | 03/01/2020 | 07/31/2023 |
Sealed Corridor in Ventura County
|
Ventura | $13,330 | $11 | 12/31/2013 | 02/01/2017 |
Simi Valley Metrolink Station Parking Lot Rehab and ADA Upgrades
|
Ventura | $477 | $471 | 03/09/2015 | 04/17/2015 |
Simi Valley Purchase 3 CNG Fixed Route Buses
|
Ventura | $1,550 | $1,550 | 12/15/2019 | 12/31/2020 |
Simi Valley Purchase 6 CNG Paratransit
|
Ventura | $1,235 | $1,169 | 08/17/2015 | 09/22/2016 |
Simi Valley Transit - CNG Fueling Facility Modernization
|
Ventura | $1,975 | $547 | 10/22/2021 | 04/15/2023 |
Simi Valley Transit - Fixed-Route Bus Replacement (3)
|
Ventura | $1,460 | $1,410 | 03/31/2014 | 01/01/2015 |
Structure Rehabilitation in Ventura County
|
Ventura | $2,630 | $102 | 11/01/2021 | 12/01/2022 |
TO Transit - CNG Storage Expansion
|
Ventura | $55 | $55 | 02/01/2015 | 05/31/2015 |
TO Transit - Operations Center Bus Parking
|
Ventura | $1,703 | $140 | 11/04/2012 | 02/28/2014 |
TO Transit - Portable Bus Lift & Storage Shelter
|
Ventura | $66 | $65 | 10/01/2012 | 01/31/2014 |
TO Transit - Replacement Buses (2)
|
Ventura | $1,652 | $791 | 03/01/2017 | 06/27/2017 |
TO Transit - Transit Center Expansion
|
Ventura | $1,512 | $1,250 | 01/22/2013 | 08/30/2013 |
Thousand Oaks Community Trans. Center Improvements
|
Ventura | $2,101 | $700 | 07/09/2007 | 12/16/2008 |
VISTA Bus Acquisition
|
Ventura | $9,010 | $6,010 | 04/01/2014 | 12/01/2014 |
VISTA Bus Particulate Traps
|
Ventura | $378 | $90 | 11/01/2009 | 05/31/2011 |
Ventura County Sealed Corridor
|
Ventura | $4,568 | $500 | 02/22/2013 | 11/01/2016 |
Ventura County Track Rehab
|
Ventura | $2,363 | $290 | 01/06/2012 | 03/01/2018 |
"Match funds for 4 fully equipped CNG Replacement
|
Yolo | $2,854 | $1,612 | 09/30/2008 | 03/31/2010 |
Fully Equipped Replacement Paratransit Vehicle
|
Yolo | $72 | $72 | 06/30/2008 | 12/30/2008 |
Paratransit Vehicle Replacements
|
Yolo | $1,139 | $178 | 06/16/2015 | 04/06/2016 |
Replacement of Two Double Deck Buses - Davis
|
Yolo | $1,626 | $619 | 10/19/2008 | 04/15/2010 |
Unitrans Bus Replacement
|
Yolo | $2,339 | $2,310 | 04/01/2009 | 06/01/2010 |
Unitrans Electric Bus Purchase
|
Yolo | $3,951 | $1,849 | 07/12/2022 | 06/30/2023 |
Unitrans High Capacity Transit Buses
|
Yolo | $2,207 | $781 | 10/01/2018 | 10/31/2018 |
YCTD Maintenance/Operations Facility Improvements
|
Yolo | $6,191 | $2,464 | 07/01/2011 | 09/18/2012 |
Yolo County Fixed-Route Bus Replacement
|
Yolo | $4,373 | $226 | 07/27/2016 | 04/30/2018 |
Yolobus Rehab. & Repower 9 Transit Buses
|
Yolo | $2,649 | $164 | 09/01/2008 | 01/30/2009 |
Purchase Seven (7) Commuter Buses
|
Yuba | $3,389 | $3,389 | 09/30/2017 | 01/31/2018 |
Vehicles for Agricultural Worker Transportation
|
Yuba | $810 | $100 | 04/01/2010 | 10/01/2010 |
Yuba Sutter Front Runner Cutaway Bus Purchase
|
Yuba | $550 | $0 | 12/01/2022 | 06/30/2023 |
Yuba Sutter Transit Operations, Maint., Admin., Facility Expansion
|
Yuba | $3,270 | $2,366 | 07/01/2009 | 11/30/2011 |
Yuba-Sutter Transit Commuter Buses
|
Yuba | $1,736 | $695 | 04/19/2012 | 10/31/2012 |
Total | $21,136,924 | $3,587,861 |
* Represent total bond funds planned